A platform for research: civil engineering, architecture and urbanism
The invention discloses a concrete spreader. The concrete spreader comprises a feed port, a base, a vertical pipe, a vertical column, an electronic control cabinet, a counter weight frame, a beam, a transverse pipe, a front pipe and a material guide pipe. The base is fixed to the bottom of the vertical column. A drawing frame is fixed to the joint of the vertical column and the base. Walking wheels are arranged at the bottom of the base. Supporting legs are arranged inside the walking wheels. The vertical pipe is fixed in the vertical column. A transition supporting column is fixed to the top of the vertical column. A rotation bearing is arranged above the transition supporting column. The beam is arranged on the other side of the upper portion of the rotation bearing through cooperation of a beam head and a beam tail. The transverse pipe is fixed above the beam through a supporting rod. The front pipe is arranged at the end, away from the rotation bearing, of the beam through a rotation support. The front pipe is connected with the front end of the beam through an inclined stay cable. The front end of the front pipe is connected with the material guide pipe. The concrete spreader is high in flexibility and stability, convenient to move and capable of improving spreading efficiency and safety.
The invention discloses a concrete spreader. The concrete spreader comprises a feed port, a base, a vertical pipe, a vertical column, an electronic control cabinet, a counter weight frame, a beam, a transverse pipe, a front pipe and a material guide pipe. The base is fixed to the bottom of the vertical column. A drawing frame is fixed to the joint of the vertical column and the base. Walking wheels are arranged at the bottom of the base. Supporting legs are arranged inside the walking wheels. The vertical pipe is fixed in the vertical column. A transition supporting column is fixed to the top of the vertical column. A rotation bearing is arranged above the transition supporting column. The beam is arranged on the other side of the upper portion of the rotation bearing through cooperation of a beam head and a beam tail. The transverse pipe is fixed above the beam through a supporting rod. The front pipe is arranged at the end, away from the rotation bearing, of the beam through a rotation support. The front pipe is connected with the front end of the beam through an inclined stay cable. The front end of the front pipe is connected with the material guide pipe. The concrete spreader is high in flexibility and stability, convenient to move and capable of improving spreading efficiency and safety.