A platform for research: civil engineering, architecture and urbanism
Ceiling connecting pieces, ceiling assemblies and ceiling assemblies
The invention discloses ceiling connecting pieces, ceiling assemblies and ceiling assemblies. The ceiling connecting pieces comprise positioning plates, first embedding plates, second embedding platesand third embedding plates, wherein the first embedding plates, the second embedding plates and the third embedding plates are connected to the positioning plates, the first embedding plates and thesecond embedding plates are oppositely arranged, and the second embedding plates and the third embedding plates are oppositely arranged; the ceiling assemblies comprise first top plates, second top plates and the ceiling connecting pieces; first clamping grooves are formed in the first top plates, and second clamping grooves are formed in the second top plates; first embedding ends are embedded inthe first clamping grooves, second embedding ends are embedded in the second clamping grooves, first embedded protrusions abut against two groove walls arranged oppositely in the first clamping grooves, and second embedded protrusions abut against the two groove walls arranged oppositely in the second clamping grooves; the ceiling assemblies comprises keels, top plate connecting pieces and at least two ceiling assemblies, and the at least two ceiling assemblies are arranged in sequence. According to the ceiling connecting pieces, the ceiling assemblies and the ceiling assemblies, and the structural stability of top plates at the splicing position is increased.
本发明公开了一种吊顶连接件、吊顶组件以及吊顶总成。吊顶连接件包括定位板、连接在定位板上的第一嵌设板、第二嵌设板和第三嵌设板,第一嵌设板与第二嵌设板相对设置、第二嵌设板与第三嵌设板相对设置。吊顶组件包括第一顶板和第二顶板、吊顶连接件;第一顶板上开设有第一卡槽,第二顶板上开设有第二卡槽;第一嵌设端嵌设在第一卡槽,第二嵌设端嵌设在第二卡槽,第一嵌设凸起抵接在第一卡槽内相对设置的两个槽壁上,第二嵌设凸起抵接在第二卡槽内相对设置的两个槽壁上。吊顶总成包括龙骨、顶板连接件以及至少两个吊顶组件,至少两个吊顶组件依次排列设置。本发明提供的吊顶连接件、吊顶组件以及吊顶总成,增加了顶板在拼接处的结构稳定性。
Ceiling connecting pieces, ceiling assemblies and ceiling assemblies
The invention discloses ceiling connecting pieces, ceiling assemblies and ceiling assemblies. The ceiling connecting pieces comprise positioning plates, first embedding plates, second embedding platesand third embedding plates, wherein the first embedding plates, the second embedding plates and the third embedding plates are connected to the positioning plates, the first embedding plates and thesecond embedding plates are oppositely arranged, and the second embedding plates and the third embedding plates are oppositely arranged; the ceiling assemblies comprise first top plates, second top plates and the ceiling connecting pieces; first clamping grooves are formed in the first top plates, and second clamping grooves are formed in the second top plates; first embedding ends are embedded inthe first clamping grooves, second embedding ends are embedded in the second clamping grooves, first embedded protrusions abut against two groove walls arranged oppositely in the first clamping grooves, and second embedded protrusions abut against the two groove walls arranged oppositely in the second clamping grooves; the ceiling assemblies comprises keels, top plate connecting pieces and at least two ceiling assemblies, and the at least two ceiling assemblies are arranged in sequence. According to the ceiling connecting pieces, the ceiling assemblies and the ceiling assemblies, and the structural stability of top plates at the splicing position is increased.
本发明公开了一种吊顶连接件、吊顶组件以及吊顶总成。吊顶连接件包括定位板、连接在定位板上的第一嵌设板、第二嵌设板和第三嵌设板,第一嵌设板与第二嵌设板相对设置、第二嵌设板与第三嵌设板相对设置。吊顶组件包括第一顶板和第二顶板、吊顶连接件;第一顶板上开设有第一卡槽,第二顶板上开设有第二卡槽;第一嵌设端嵌设在第一卡槽,第二嵌设端嵌设在第二卡槽,第一嵌设凸起抵接在第一卡槽内相对设置的两个槽壁上,第二嵌设凸起抵接在第二卡槽内相对设置的两个槽壁上。吊顶总成包括龙骨、顶板连接件以及至少两个吊顶组件,至少两个吊顶组件依次排列设置。本发明提供的吊顶连接件、吊顶组件以及吊顶总成,增加了顶板在拼接处的结构稳定性。
Ceiling connecting pieces, ceiling assemblies and ceiling assemblies
吊顶连接件、吊顶组件以及吊顶总成
DING XINXIN (author) / DING ZECHENG (author) / WANG WENGUANG (author) / ZHOU DONGSHAN (author) / WANG CONGCONG (author) / BU TING (author)
2020-04-14
Patent
Electronic Resource
Chinese
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
Ceiling connecting piece and ceiling with ceiling connecting pieces
European Patent Office | 2015
|DESIGNING STONE WOOL CEILING ASSEMBLIES
British Library Online Contents | 2014
|