A platform for research: civil engineering, architecture and urbanism
The embodiment of the invention discloses a guide pipe frame closing process, a supporting frame and a supporting assembly. The process comprises the following steps of constructing the supporting assembly; positioning and placing the lower section of the guide pipe frame; and integrally closing the guide pipe frame. The supporting frame comprises at least one placing plate placed on an operatingplatform, a sliding rail arranged on each placing plate, and a plurality of carrying workpieces slidably arranged on the sliding rail, and the plurality of carrying workpieces are provided with box beam tools used for placing main supporting tubes. The supporting assembly comprises the supporting frame, and a power supply unit for pulling the carrying workpieces to slip along the slip rails. According to the process, the supporting frame and the supporting assembly, a common wharf can also be operated in the field, the problem that the cost is increased due to the fact that an independent machining area is divided is avoided, meanwhile, the carrying difficulty in the adjusting process is further reduced, and the carrying efficiency is improved.
本发明实施例公开了一种导管架合拢工艺、支撑架和支撑组件,工艺包括:支撑组件的构建;导管架的下段的定位放置;导管架的整体合拢。支撑架包括放置于操作平台上的至少一块放置板,设置于每块放置板上的滑移轨道,以及可滑移地设置于滑移轨道上的多个运载工件;且,多个运载工件上设置有用于放置主撑管的箱梁工装。支撑组件包括支撑架,以及用于牵引运载工件沿滑移轨道滑移的动力提供单元。实现了普通码头也可以实地进行操作,避免了划分独立加工区域而导致成本增加的问题,同时,进一步降低了调整过程中的搬运难度,提高了搬运效率。
The embodiment of the invention discloses a guide pipe frame closing process, a supporting frame and a supporting assembly. The process comprises the following steps of constructing the supporting assembly; positioning and placing the lower section of the guide pipe frame; and integrally closing the guide pipe frame. The supporting frame comprises at least one placing plate placed on an operatingplatform, a sliding rail arranged on each placing plate, and a plurality of carrying workpieces slidably arranged on the sliding rail, and the plurality of carrying workpieces are provided with box beam tools used for placing main supporting tubes. The supporting assembly comprises the supporting frame, and a power supply unit for pulling the carrying workpieces to slip along the slip rails. According to the process, the supporting frame and the supporting assembly, a common wharf can also be operated in the field, the problem that the cost is increased due to the fact that an independent machining area is divided is avoided, meanwhile, the carrying difficulty in the adjusting process is further reduced, and the carrying efficiency is improved.
本发明实施例公开了一种导管架合拢工艺、支撑架和支撑组件,工艺包括:支撑组件的构建;导管架的下段的定位放置;导管架的整体合拢。支撑架包括放置于操作平台上的至少一块放置板,设置于每块放置板上的滑移轨道,以及可滑移地设置于滑移轨道上的多个运载工件;且,多个运载工件上设置有用于放置主撑管的箱梁工装。支撑组件包括支撑架,以及用于牵引运载工件沿滑移轨道滑移的动力提供单元。实现了普通码头也可以实地进行操作,避免了划分独立加工区域而导致成本增加的问题,同时,进一步降低了调整过程中的搬运难度,提高了搬运效率。
Guide pipe frame closing process, supporting frame and supporting assembly
一种导管架合拢工艺、支撑架和支撑组件
2020-04-21
Patent
Electronic Resource
Chinese