Cover-excavation total reverse design construction method of urban underground engineering
The invention relates to the technical field of cover-excavation total reverse design construction of urban underground engineering, and discloses a cover-excavation total reverse design constructionmethod of the urban underground engineering. The method comprises the following steps of S1, design construction of a top plate; S2, design construction of a wall body; S3, design construction of a wall column; S4, design construction of a bottom plate; and S5, design construction of a multi-layer engineering structure. According to the cover-excavation total reverse design construction method ofthe urban underground engineering, the construction period is significantly shortened by 20% compared with the construction of a cover-excavation reverse construction method, and the construction efficiency of construction of the urban underground engineering by the cover-excavation total reverse method is greatly improved.
本发明涉及城市地下工程盖挖全逆做设计施工技术领域,公开了一种城市地下工程盖挖全逆做设计施工方法:步骤一、顶板的设计施工;步骤二、墙体的设计施工;步骤三、墙柱的设计施工;步骤四、底板的设计施工;步骤五、多层工程结构的设计施工。这种城市地下工程盖挖全逆做设计施工方法,该方法与盖挖逆作法施工相比能显著地缩短工期20%,大大提高盖挖全逆做法建造城市地下工程的施工效率。
Cover-excavation total reverse design construction method of urban underground engineering
The invention relates to the technical field of cover-excavation total reverse design construction of urban underground engineering, and discloses a cover-excavation total reverse design constructionmethod of the urban underground engineering. The method comprises the following steps of S1, design construction of a top plate; S2, design construction of a wall body; S3, design construction of a wall column; S4, design construction of a bottom plate; and S5, design construction of a multi-layer engineering structure. According to the cover-excavation total reverse design construction method ofthe urban underground engineering, the construction period is significantly shortened by 20% compared with the construction of a cover-excavation reverse construction method, and the construction efficiency of construction of the urban underground engineering by the cover-excavation total reverse method is greatly improved.
本发明涉及城市地下工程盖挖全逆做设计施工技术领域,公开了一种城市地下工程盖挖全逆做设计施工方法:步骤一、顶板的设计施工;步骤二、墙体的设计施工;步骤三、墙柱的设计施工;步骤四、底板的设计施工;步骤五、多层工程结构的设计施工。这种城市地下工程盖挖全逆做设计施工方法,该方法与盖挖逆作法施工相比能显著地缩短工期20%,大大提高盖挖全逆做法建造城市地下工程的施工效率。
Cover-excavation total reverse design construction method of urban underground engineering
一种城市地下工程盖挖全逆做设计施工方法
LIU FEI (author) / FANG JIANHUI (author) / GAO YONGHONG (author) / LI HUANQIU (author) / HUANG XU (author) / WU AIMIN (author)
2020-04-24
Patent
Electronic Resource
Chinese