A platform for research: civil engineering, architecture and urbanism
Preparation method of building shock insulation rubber support and building shock insulation rubber support prepared by applying same
The invention provides a preparation method of a building shock insulation rubber support and the building shock insulation rubber support product prepared by applying the same. The preparation methodcomprises the following steps that firstly, a rubber compound material is prepared, a steel plate is cut, and laminating and forming are carried out on the rubber compound material and the cut steelplate subjected to shot blasting to obtain a semi-finished product to be subjected to mold filling; the semi-finished product to be subjected to mold filling is placed into a heating device for preheating, and after the temperature rises to 75-85 DEG C at the speed of 5 DEG C/min in the preheating process, the temperature is kept for more than 4 hours; mold filling and vulcanizing are carried outon the preheated semi-finished product; and demolding and trimming are carried out to obtain the building shock insulation rubber support. By adding the preheating step, adjusting the formula and improving the process, the vulcanization uniformity and the vulcanization efficiency of the building shock insulation rubber support are effectively improved.
本发明提供了一种建筑隔震橡胶支座制备方法及其产品,首先制备混炼胶料、裁剪钢板、将混炼胶与裁剪好经过抛丸的钢板贴合成型,成为待装模的半成品;将待装模的半成品放入加热装置中进行预加热,预加热过程以5℃/min的速度升至75℃~85℃后,保温时间大于4h;将上述预热好的半成品进行装模、硫化;出模、修边,即得建筑隔震橡胶支座;本发明通过增加预热步骤、调节配方、改进工艺,有效提高了建筑隔震橡胶支座的硫化均一性和硫化效率。
Preparation method of building shock insulation rubber support and building shock insulation rubber support prepared by applying same
The invention provides a preparation method of a building shock insulation rubber support and the building shock insulation rubber support product prepared by applying the same. The preparation methodcomprises the following steps that firstly, a rubber compound material is prepared, a steel plate is cut, and laminating and forming are carried out on the rubber compound material and the cut steelplate subjected to shot blasting to obtain a semi-finished product to be subjected to mold filling; the semi-finished product to be subjected to mold filling is placed into a heating device for preheating, and after the temperature rises to 75-85 DEG C at the speed of 5 DEG C/min in the preheating process, the temperature is kept for more than 4 hours; mold filling and vulcanizing are carried outon the preheated semi-finished product; and demolding and trimming are carried out to obtain the building shock insulation rubber support. By adding the preheating step, adjusting the formula and improving the process, the vulcanization uniformity and the vulcanization efficiency of the building shock insulation rubber support are effectively improved.
本发明提供了一种建筑隔震橡胶支座制备方法及其产品,首先制备混炼胶料、裁剪钢板、将混炼胶与裁剪好经过抛丸的钢板贴合成型,成为待装模的半成品;将待装模的半成品放入加热装置中进行预加热,预加热过程以5℃/min的速度升至75℃~85℃后,保温时间大于4h;将上述预热好的半成品进行装模、硫化;出模、修边,即得建筑隔震橡胶支座;本发明通过增加预热步骤、调节配方、改进工艺,有效提高了建筑隔震橡胶支座的硫化均一性和硫化效率。
Preparation method of building shock insulation rubber support and building shock insulation rubber support prepared by applying same
一种建筑隔震橡胶支座制备方法及其产品
LIU XINLIANG (author) / ZHAO GUIYING (author) / GU LINING (author) / ZHANG HONGYONG (author) / CHANG GUANGZHONG (author) / SU WEI (author)
2020-04-28
Patent
Electronic Resource
Chinese
IPC:
B29C
Formen oder Verbinden von Kunststoffen
,
SHAPING OR JOINING OF PLASTICS
/
C08K
Verwendung von anorganischen oder nichtmakromolekularen organischen Stoffen als Zusatzstoffe
,
USE OF INORGANIC OR NON-MACROMOLECULAR ORGANIC SUBSTANCES AS COMPOUNDING INGREDIENTS
/
C08L
COMPOSITIONS OF MACROMOLECULAR COMPOUNDS
,
Massen auf Basis makromolekularer Verbindungen
/
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
/
E04H
Gebäude oder ähnliche Bauwerke für besondere Zwecke
,
BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES
European Patent Office | 2024
|European Patent Office | 2024
|