A platform for research: civil engineering, architecture and urbanism
Disassembly-free formwork concrete shear wall structure building and construction method thereof
The invention relates to a disassembly-free formwork concrete shear wall structure building and a construction method thereof. A shear wall body in the building is mainly composed of steel bar truss fixing formworks positioned on the two sides of the wall body and a concrete layer poured between the steel bar truss fixing formworks on the two sides, wherein the steel bar truss fixing formworks comprise panels, and steel bar meshes and steel bar trusses which are positioned on the inner sides of the panels; the steel bar meshes and the steel bar trusses are consolidated in the concrete layer; and corresponding steel bar connecting frames are respectively arranged in various wall body joints. The construction of the shear wall body in the construction method comprises the steps of formwork installation, formwork fixing, concrete pouring, wall body maintenance and the like. According to the disassembly-free formwork concrete shear wall structure building and the construction method thereof, the workload and working strength of building construction are favorably reduced, the influence degree of human factors on the building quality is reduced, the construction cost is reduced, the pipeline arrangement on the building is convenient, and the negative influence of the pipeline arrangement on the wall body is reduced or avoided.
本发明涉及一种免拆模板混凝土剪力墙结构建筑及其建造方法。所述建筑中的剪力墙墙体主要由位于墙体两侧的钢筋桁架固模板和浇筑在两侧钢筋桁架固模板之间的混凝土层构成,所述钢筋桁架固模板包括面板和位于所述面板内侧的钢筋网及钢筋桁架,所述钢筋网和钢筋桁架固结在所述混凝土层中,各种墙体节点内分别设有相应的钢筋连接架。所述建造方法中剪力墙墙体的建造包括模板安装、模板固定、混凝土浇筑和墙体养护等步骤。本发明有利于减少建筑施工的工作量和工作强度,减小人为因素对建筑质量的影响程度,降低建造成本,方便建筑上的管线布置,减轻或避免因布设管线给墙体带来的负面影响。
Disassembly-free formwork concrete shear wall structure building and construction method thereof
The invention relates to a disassembly-free formwork concrete shear wall structure building and a construction method thereof. A shear wall body in the building is mainly composed of steel bar truss fixing formworks positioned on the two sides of the wall body and a concrete layer poured between the steel bar truss fixing formworks on the two sides, wherein the steel bar truss fixing formworks comprise panels, and steel bar meshes and steel bar trusses which are positioned on the inner sides of the panels; the steel bar meshes and the steel bar trusses are consolidated in the concrete layer; and corresponding steel bar connecting frames are respectively arranged in various wall body joints. The construction of the shear wall body in the construction method comprises the steps of formwork installation, formwork fixing, concrete pouring, wall body maintenance and the like. According to the disassembly-free formwork concrete shear wall structure building and the construction method thereof, the workload and working strength of building construction are favorably reduced, the influence degree of human factors on the building quality is reduced, the construction cost is reduced, the pipeline arrangement on the building is convenient, and the negative influence of the pipeline arrangement on the wall body is reduced or avoided.
本发明涉及一种免拆模板混凝土剪力墙结构建筑及其建造方法。所述建筑中的剪力墙墙体主要由位于墙体两侧的钢筋桁架固模板和浇筑在两侧钢筋桁架固模板之间的混凝土层构成,所述钢筋桁架固模板包括面板和位于所述面板内侧的钢筋网及钢筋桁架,所述钢筋网和钢筋桁架固结在所述混凝土层中,各种墙体节点内分别设有相应的钢筋连接架。所述建造方法中剪力墙墙体的建造包括模板安装、模板固定、混凝土浇筑和墙体养护等步骤。本发明有利于减少建筑施工的工作量和工作强度,减小人为因素对建筑质量的影响程度,降低建造成本,方便建筑上的管线布置,减轻或避免因布设管线给墙体带来的负面影响。
Disassembly-free formwork concrete shear wall structure building and construction method thereof
一种免拆模板混凝土剪力墙结构建筑及其建造方法
HOU JIANQUN (author) / LIU BIN (author) / REN BAOSHUANG (author)
2020-04-28
Patent
Electronic Resource
Chinese
European Patent Office | 2022
|European Patent Office | 2022
|Disassembly-free prefabricated concrete thermal-insulation wall formwork
European Patent Office | 2015
|Formwork-free shear wall and construction method thereof
European Patent Office | 2015
|