A platform for research: civil engineering, architecture and urbanism
一种地铁车站附属结构及其施工工艺
本发明公开了一种地铁车站附属结构,其特征在于:包括顶管机外壳(6)、壳内二衬(7)、暗挖部分、附属结构顶管部分(4)和附属结构明挖部分(3);暗挖部分一端与车站主体(1)连接,另一端连接壳内二衬(7),顶管机外壳(6)与附属结构顶管部分(4)连接;附属结构顶管部分(4)与附属结构明挖部分(3)连接,所述的顶管机外壳(6)包覆在壳内二衬(7)外表面。
The invention discloses a metro station accessory structure which is characterized by comprising a tube push bench shell (6), a second shell lining (7), an underground excavation part, an accessory structure tube push part (4) and an accessory structure open excavation part (3); one end of the underground excavation part is connected with a station main body (1); the other end of the underground excavation part is connected with the second shell lining (7); the tube push bench shell (6) is connected with the accessory structure tube push part (4); the accessory structure tube push part (4) isconnected with the accessory structure open excavation part (3); and the outer surface of the second shell lining (7) is coated with the tube push bench shell (6).
一种地铁车站附属结构及其施工工艺
本发明公开了一种地铁车站附属结构,其特征在于:包括顶管机外壳(6)、壳内二衬(7)、暗挖部分、附属结构顶管部分(4)和附属结构明挖部分(3);暗挖部分一端与车站主体(1)连接,另一端连接壳内二衬(7),顶管机外壳(6)与附属结构顶管部分(4)连接;附属结构顶管部分(4)与附属结构明挖部分(3)连接,所述的顶管机外壳(6)包覆在壳内二衬(7)外表面。
The invention discloses a metro station accessory structure which is characterized by comprising a tube push bench shell (6), a second shell lining (7), an underground excavation part, an accessory structure tube push part (4) and an accessory structure open excavation part (3); one end of the underground excavation part is connected with a station main body (1); the other end of the underground excavation part is connected with the second shell lining (7); the tube push bench shell (6) is connected with the accessory structure tube push part (4); the accessory structure tube push part (4) isconnected with the accessory structure open excavation part (3); and the outer surface of the second shell lining (7) is coated with the tube push bench shell (6).