Intersection side alternate construction method for dense built up area
The invention provides an intersection side alternate construction method for a dense built up area. The method comprises the following steps that a first intersection side alternate construction enclosure area and a second intersection side alternate construction enclosure area are sealed, and a first intersection side alternate construction open area is reserved; the first intersection side alternate construction enclosure area is shortened to as to form the shortened first intersection side alternate construction enclosure area, and the second intersection side alternate construction enclosure area is extended so as to form the extended second intersection side alternate construction enclosure area; and the shortened first intersection side alternate construction enclosure area and theextended second intersection side alternate construction enclosure area are closed, and a second intersection side alternate construction open area is reserved. By means of the method, traffic is notinfluenced, and when side alternate construction is carried out on an underground comprehensive pipe gallery at an intersection with heavy traffic, the implementation speed of open cut construction ofthe underground comprehensive pipe gallery at the intersection can be effectively increased.
本发明提供了一种密集建成区平交口倒边施工方法,该方法包括如下步骤:对第一路口倒边施工围蔽区域和第二路口倒边施工围蔽区域进行封闭,并预留第一路口倒边施工开放区域;对第一路口倒边施工围蔽区域进行缩短,以形成缩短式第一路口倒边施工围蔽区域,并对第二路口倒边施工围蔽区域进行延伸,以形成延伸式第二路口倒边施工围蔽区域;对缩短式第一路口倒边施工围蔽区域和延伸式第二路口倒边施工围蔽区域进行封闭,并预留第二路口倒边施工开放区域。该方法不影响交通,且在交通繁忙平交口对地下综合管廊进行倒边施工时,可有效提高地下综合管廊在平交口明挖施工的实施速度。
Intersection side alternate construction method for dense built up area
The invention provides an intersection side alternate construction method for a dense built up area. The method comprises the following steps that a first intersection side alternate construction enclosure area and a second intersection side alternate construction enclosure area are sealed, and a first intersection side alternate construction open area is reserved; the first intersection side alternate construction enclosure area is shortened to as to form the shortened first intersection side alternate construction enclosure area, and the second intersection side alternate construction enclosure area is extended so as to form the extended second intersection side alternate construction enclosure area; and the shortened first intersection side alternate construction enclosure area and theextended second intersection side alternate construction enclosure area are closed, and a second intersection side alternate construction open area is reserved. By means of the method, traffic is notinfluenced, and when side alternate construction is carried out on an underground comprehensive pipe gallery at an intersection with heavy traffic, the implementation speed of open cut construction ofthe underground comprehensive pipe gallery at the intersection can be effectively increased.
本发明提供了一种密集建成区平交口倒边施工方法,该方法包括如下步骤:对第一路口倒边施工围蔽区域和第二路口倒边施工围蔽区域进行封闭,并预留第一路口倒边施工开放区域;对第一路口倒边施工围蔽区域进行缩短,以形成缩短式第一路口倒边施工围蔽区域,并对第二路口倒边施工围蔽区域进行延伸,以形成延伸式第二路口倒边施工围蔽区域;对缩短式第一路口倒边施工围蔽区域和延伸式第二路口倒边施工围蔽区域进行封闭,并预留第二路口倒边施工开放区域。该方法不影响交通,且在交通繁忙平交口对地下综合管廊进行倒边施工时,可有效提高地下综合管廊在平交口明挖施工的实施速度。
Intersection side alternate construction method for dense built up area
密集建成区平交口倒边施工方法
GUAN LIANKUN (author) / LI XINGJIE (author) / GAO YA (author) / ZHOU ZHAOYANG (author)
2020-05-05
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Self-luminous four-side warning method for intersection construction
European Patent Office | 2021
|Intersection construction portable telescopic four-side warning lamp
European Patent Office | 2021
|Urban Landscape in Public Places of Dense Built Area
British Library Conference Proceedings | 2010
|Existing-newly-built side-by-side sheet-pile wall retaining structure and construction method
European Patent Office | 2020
|European Patent Office | 2024
|