A platform for research: civil engineering, architecture and urbanism
Construction auxiliary device and construction method of prefabricated concrete drainage ditch
The invention discloses a construction auxiliary device and construction method of a prefabricated concrete drainage ditch. A material stacking device of a concrete rectangular trough comprises a trolley, a vertical column, a crossbeam and a material clamping device, the lower end of the vertical column is fixed to the trolly, the crossbeam includes an end head sleeve pipe and a main beam, the endhead sleeve pipe is arranged on the vertical column in an up-down-sliding mode, and a through slot penetrating through the two sides is formed in the middle of the vertical column. One end of the main beam penetrates through the pipe wall of the end head sleeve pipe and the through slot of the vertical column, and the main beam is rotatably connected with the end head sleeve pipe. A material stacking method uses the material stacking device. The main beam can be lifted, lowered and rotated, so that the slot opening orientation and height of the concrete rectangular trough can be adjusted after the concrete rectangular trough is clamped, and the concrete rectangular trough can be conveniently clamped and transported to a designated position.
本发明公开了一种预制混凝土排水沟施工辅助装置及施工方法,本发明混凝土矩形槽的堆料装置包括小车、立柱、横梁和夹料装置,立柱下端固定在小车上,横梁包括端头套管和主梁,端头套管上下滑动的设置在立柱上,立柱的中间设置有贯穿两侧的通槽,主梁的一端贯穿端头套管的管壁和立柱的通槽,主梁与端头套管转动连接。本发明堆料方法采用前述堆料装置。本发明设置的主梁既可以升降又可以旋转,使得夹取混凝土矩形槽后可以调节混凝土矩形槽的槽口朝向和高度,能便于夹取混凝土矩形槽和运送到指定位置。
Construction auxiliary device and construction method of prefabricated concrete drainage ditch
The invention discloses a construction auxiliary device and construction method of a prefabricated concrete drainage ditch. A material stacking device of a concrete rectangular trough comprises a trolley, a vertical column, a crossbeam and a material clamping device, the lower end of the vertical column is fixed to the trolly, the crossbeam includes an end head sleeve pipe and a main beam, the endhead sleeve pipe is arranged on the vertical column in an up-down-sliding mode, and a through slot penetrating through the two sides is formed in the middle of the vertical column. One end of the main beam penetrates through the pipe wall of the end head sleeve pipe and the through slot of the vertical column, and the main beam is rotatably connected with the end head sleeve pipe. A material stacking method uses the material stacking device. The main beam can be lifted, lowered and rotated, so that the slot opening orientation and height of the concrete rectangular trough can be adjusted after the concrete rectangular trough is clamped, and the concrete rectangular trough can be conveniently clamped and transported to a designated position.
本发明公开了一种预制混凝土排水沟施工辅助装置及施工方法,本发明混凝土矩形槽的堆料装置包括小车、立柱、横梁和夹料装置,立柱下端固定在小车上,横梁包括端头套管和主梁,端头套管上下滑动的设置在立柱上,立柱的中间设置有贯穿两侧的通槽,主梁的一端贯穿端头套管的管壁和立柱的通槽,主梁与端头套管转动连接。本发明堆料方法采用前述堆料装置。本发明设置的主梁既可以升降又可以旋转,使得夹取混凝土矩形槽后可以调节混凝土矩形槽的槽口朝向和高度,能便于夹取混凝土矩形槽和运送到指定位置。
Construction auxiliary device and construction method of prefabricated concrete drainage ditch
一种预制混凝土排水沟施工辅助装置及施工方法
CHEN RENSHAN (author) / ZHANG WEI (author) / LI JUTONG (author)
2020-05-08
Patent
Electronic Resource
Chinese
IPC:
E03F
SEWERS
,
Abwasserkanäle
Prefabricated HDPE linear drainage ditch paving equipment and construction method
European Patent Office | 2020
|Prefabricated concrete U-shaped side ditch and construction method
European Patent Office | 2020
|