Integrated hanging type oversized aluminum plate curtain wall construction method
The invention relates to industry and civil architecture, in particular to an integrated hanging type oversized aluminum plate curtain wall construction method. The construction method comprises the following steps of A, a preparation process; B, a design process, 1, adjusting the grid size of a curtain wall according to a curtain wall construction drawing and the size actually measured on site; 2, determining grid points in a computer simulated diagram after the grid of the curtain wall is determined; 3, establishing a rectangular coordinate system by taking the middle point of a chord lengthof an inner contour in an arc-shaped curtain wall skeleton in the simulated diagram as an origin of coordinates, the chord length as an X axis and chord height as a Y axis; 4, determining the coordinates (Xn, Yn) of curtain wall grid points; 5, determining the central axis of an upright post of the curtain wall according to the intersection point dn(dn,0) of the connecting line of the curtain wall grid points and the circle centre of the inner contour of the curtain wall skeleton, and the points Dn and dn; C, a measurement process, 1, pulling a chord length line; 2, pulling a chord length line; 3, establishing the rectangular coordinate system according to the origin of the coordinates in the step B, converting to an actual measurement site according to the (Xn, Yn) positioned by AutoCADin the step B; 4, positioning the point D1(X1,Y1); and 5, determining mounting positioning points Dn(Xn, Yn) and dn(dn,0) of the upright post in sequence so as to determine the positioning axis of theupright post.
本发明涉及工业与民用建筑,特别是一种整体吊挂式超大幅面铝板幕墙施工方法。包括如下步骤:A、准备工序;B、设计工序1、根据幕墙施工图以及现场实测尺寸调整幕墙分格尺寸;2、幕墙分格确定后在计算机模拟图中确定分格点;3、在模拟图形中圆弧形的幕墙骨架内围线的弦长的中点为坐标原点,弦长为X轴,弦高为Y轴,建立直角坐标系;4、确定幕墙分格点坐标(Xn,Yn);5、根据幕墙分格点和幕墙骨架内围线的圆心的连线与弦长交点dn(dn,0),点Dn、dn两点确定幕墙立柱中心轴线;C、测量工序1、拉弦长线;2、拉弦高线;3、以步骤B中的坐标原点建立直角坐标系,根据步骤B中AutoCAD已定位的(Xn,Yn)转换到实测现场;4、定位点D1(X1,Y1);5、依次确定立柱安装定位点Dn(Xn,Yn),dn(dn,0),从而确定立柱定位轴线。
Integrated hanging type oversized aluminum plate curtain wall construction method
The invention relates to industry and civil architecture, in particular to an integrated hanging type oversized aluminum plate curtain wall construction method. The construction method comprises the following steps of A, a preparation process; B, a design process, 1, adjusting the grid size of a curtain wall according to a curtain wall construction drawing and the size actually measured on site; 2, determining grid points in a computer simulated diagram after the grid of the curtain wall is determined; 3, establishing a rectangular coordinate system by taking the middle point of a chord lengthof an inner contour in an arc-shaped curtain wall skeleton in the simulated diagram as an origin of coordinates, the chord length as an X axis and chord height as a Y axis; 4, determining the coordinates (Xn, Yn) of curtain wall grid points; 5, determining the central axis of an upright post of the curtain wall according to the intersection point dn(dn,0) of the connecting line of the curtain wall grid points and the circle centre of the inner contour of the curtain wall skeleton, and the points Dn and dn; C, a measurement process, 1, pulling a chord length line; 2, pulling a chord length line; 3, establishing the rectangular coordinate system according to the origin of the coordinates in the step B, converting to an actual measurement site according to the (Xn, Yn) positioned by AutoCADin the step B; 4, positioning the point D1(X1,Y1); and 5, determining mounting positioning points Dn(Xn, Yn) and dn(dn,0) of the upright post in sequence so as to determine the positioning axis of theupright post.
本发明涉及工业与民用建筑,特别是一种整体吊挂式超大幅面铝板幕墙施工方法。包括如下步骤:A、准备工序;B、设计工序1、根据幕墙施工图以及现场实测尺寸调整幕墙分格尺寸;2、幕墙分格确定后在计算机模拟图中确定分格点;3、在模拟图形中圆弧形的幕墙骨架内围线的弦长的中点为坐标原点,弦长为X轴,弦高为Y轴,建立直角坐标系;4、确定幕墙分格点坐标(Xn,Yn);5、根据幕墙分格点和幕墙骨架内围线的圆心的连线与弦长交点dn(dn,0),点Dn、dn两点确定幕墙立柱中心轴线;C、测量工序1、拉弦长线;2、拉弦高线;3、以步骤B中的坐标原点建立直角坐标系,根据步骤B中AutoCAD已定位的(Xn,Yn)转换到实测现场;4、定位点D1(X1,Y1);5、依次确定立柱安装定位点Dn(Xn,Yn),dn(dn,0),从而确定立柱定位轴线。
Integrated hanging type oversized aluminum plate curtain wall construction method
整体吊挂式超大幅面铝板幕墙施工方法
MA JIYE (author) / REN WEIYI (author) / JIN GUOSHUAI (author)
2020-05-08
Patent
Electronic Resource
Chinese
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
Construction method of irregular aluminum plate curtain wall with oversized characters
European Patent Office | 2024
|Hanging connecting piece for oversized glass curtain wall
European Patent Office | 2021
|Method for installing oversized logo on dry hanging stone curtain wall
European Patent Office | 2024
|