Pier stud guiding and limiting device and pier stud mounting method
The invention relates to a pier stud guiding and limiting device and a pier stud mounting method. A supporting base (12) is fixed to a bearing platform; a steel cross beam (15) is arranged at one sideof the supporting base (12), a pushing device (11) is fixed over the steel cross beam (15), a guide wheel (13) is fixed to the side, close to a bearing platform inserting groove, of the steel cross beam (15), and an ejector rod of the pushing device (11) abuts against the supporting base (12); the bottom of a square frame body of a fixture (14) abuts against the bearing platform, so that the center of a cross body is centered with the center of the bearing platform inserting groove; a guide wheel (13) is adjusted to be close to the outer side of the square frame body; the cross body is removed, and slurry is poured into the bearing platform inserting groove; the prefabricated pier stud is hoisted, the guide wheel (13) is adjusted by adjusting the pushing device (11) to introduce the pierstud into the square frame body, and the pier stud is merged into the bearing platform inserting groove; vertical adjustment of the pier stud is completed through diagonal bracings; and inserting groove gap grouting is completed before initial setting of bedding mortar, and mounting of the prefabricated pier stud is completed. The method is short in time consumption and high in assembly precision.
本发明涉及一种墩柱导向限位装置及墩柱安装方法,其中,在承台上固定支撑座(12);在支撑座(12)一侧布设钢横梁(15),将顶推装置(11)固定在钢横梁(15)上方,将导向轮(13)固定在钢横梁(15)靠向承台插槽的一侧,顶推装置(11)的顶杆顶紧支撑座(12);使卡具(14)方框架体底部抵住承台,使十字架体中心与承台插槽中心对中;调整导向轮(13)使其靠紧方框架体外侧;移除十字架体,在承台插槽内座浆;吊装预制墩柱,通过调节顶推装置(11)来调整导向轮(13)将墩柱引进方框架体内,并入位承台插槽内;通过斜拉撑完成墩柱的垂直调整;座浆初凝前完成插槽缝隙灌浆,完成预制墩柱安装。本发明用时少,装配精度高。
Pier stud guiding and limiting device and pier stud mounting method
The invention relates to a pier stud guiding and limiting device and a pier stud mounting method. A supporting base (12) is fixed to a bearing platform; a steel cross beam (15) is arranged at one sideof the supporting base (12), a pushing device (11) is fixed over the steel cross beam (15), a guide wheel (13) is fixed to the side, close to a bearing platform inserting groove, of the steel cross beam (15), and an ejector rod of the pushing device (11) abuts against the supporting base (12); the bottom of a square frame body of a fixture (14) abuts against the bearing platform, so that the center of a cross body is centered with the center of the bearing platform inserting groove; a guide wheel (13) is adjusted to be close to the outer side of the square frame body; the cross body is removed, and slurry is poured into the bearing platform inserting groove; the prefabricated pier stud is hoisted, the guide wheel (13) is adjusted by adjusting the pushing device (11) to introduce the pierstud into the square frame body, and the pier stud is merged into the bearing platform inserting groove; vertical adjustment of the pier stud is completed through diagonal bracings; and inserting groove gap grouting is completed before initial setting of bedding mortar, and mounting of the prefabricated pier stud is completed. The method is short in time consumption and high in assembly precision.
本发明涉及一种墩柱导向限位装置及墩柱安装方法,其中,在承台上固定支撑座(12);在支撑座(12)一侧布设钢横梁(15),将顶推装置(11)固定在钢横梁(15)上方,将导向轮(13)固定在钢横梁(15)靠向承台插槽的一侧,顶推装置(11)的顶杆顶紧支撑座(12);使卡具(14)方框架体底部抵住承台,使十字架体中心与承台插槽中心对中;调整导向轮(13)使其靠紧方框架体外侧;移除十字架体,在承台插槽内座浆;吊装预制墩柱,通过调节顶推装置(11)来调整导向轮(13)将墩柱引进方框架体内,并入位承台插槽内;通过斜拉撑完成墩柱的垂直调整;座浆初凝前完成插槽缝隙灌浆,完成预制墩柱安装。本发明用时少,装配精度高。
Pier stud guiding and limiting device and pier stud mounting method
一种墩柱导向限位装置及墩柱装配方法
WANG LIANG (author) / ZHANG QUANHE (author) / ZHAO JIANKANG (author) / ZHANG PENG (author) / ZHOU YANG (author) / WANG YANPING (author) / ZHANG RUIZHENG (author) / ZHANG SHENGMING (author) / ZHANG HONGMEI (author) / KONG XIANGZHAO (author)
2020-05-19
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
Pier stud fair-faced concrete construction method and pier stud
European Patent Office | 2020
|Pier stud template positioning device for bridge pier stud construction and using method thereof
European Patent Office | 2021
|