Ancient building rammed earth wall waterproof and dampproof treatment method
The invention belongs to the technical field of ancient building earth wall construction, and particularly discloses an ancient building rammed earth wall waterproof and dampproof treatment method. The method comprises a rammed earth wall surface treatment method and a rammed earth wall root treatment method. The rammed earth wall surface treatment method comprises the two steps that S1, after construction of a rammed earth wall is completed, maintenance is conducted for 7-9 days till the moisture in the earth wall reaches a balance state; and S2, wall surface spraying is conducted through a water repellent. The rammed earth wall root treatment method comprises the three steps that S1, cement mortar with a thickness of 50 mm and 50 mm-thickness grouting mortar doped with epoxy resin glue are used for filling a foundation pit before earth wall pouring is carried out; S2, grouting mortar doped with epoxy resin glue is poured into a gap between every two built stone slabs of the foundation pit; and S3, after a wall root is built, grouting mortar doped with epoxy resin glue is poured into a gap between the built stone slabs and the foundation pit on the surface of the wall root througha pressure grouting method, and a rigid waterproof layer is formed.
本发明属于古建筑土墙建造技术领域,具体公开了一种古建筑夯土墙防水防潮处理方法,包括夯土墙墙面处理方法和夯土墙墙根处理方法;所述夯土墙墙面处理方法,包括S1夯土墙施工完成后,待养护7‑9天时间,至土墙内部水分达到平衡状态和S2采用憎水剂进行墙面喷涂两个步骤;夯土墙墙根处理方法;包括S1土墙浇筑前,在基坑内填入50㎜厚的水泥砂浆和50mm厚的掺有环氧树脂胶的灌浆砂浆;S1在基坑每两块垒砌石板的缝隙处灌入掺有环氧树脂胶的灌浆砂浆;S1墙根垒砌好之后,在墙根的表面采用压力灌浆方法,将掺有环氧树脂胶的灌浆砂浆灌入垒砌石板与在基坑内之间的缝隙中,形成一道刚性防水层,这三个步骤。
Ancient building rammed earth wall waterproof and dampproof treatment method
The invention belongs to the technical field of ancient building earth wall construction, and particularly discloses an ancient building rammed earth wall waterproof and dampproof treatment method. The method comprises a rammed earth wall surface treatment method and a rammed earth wall root treatment method. The rammed earth wall surface treatment method comprises the two steps that S1, after construction of a rammed earth wall is completed, maintenance is conducted for 7-9 days till the moisture in the earth wall reaches a balance state; and S2, wall surface spraying is conducted through a water repellent. The rammed earth wall root treatment method comprises the three steps that S1, cement mortar with a thickness of 50 mm and 50 mm-thickness grouting mortar doped with epoxy resin glue are used for filling a foundation pit before earth wall pouring is carried out; S2, grouting mortar doped with epoxy resin glue is poured into a gap between every two built stone slabs of the foundation pit; and S3, after a wall root is built, grouting mortar doped with epoxy resin glue is poured into a gap between the built stone slabs and the foundation pit on the surface of the wall root througha pressure grouting method, and a rigid waterproof layer is formed.
本发明属于古建筑土墙建造技术领域,具体公开了一种古建筑夯土墙防水防潮处理方法,包括夯土墙墙面处理方法和夯土墙墙根处理方法;所述夯土墙墙面处理方法,包括S1夯土墙施工完成后,待养护7‑9天时间,至土墙内部水分达到平衡状态和S2采用憎水剂进行墙面喷涂两个步骤;夯土墙墙根处理方法;包括S1土墙浇筑前,在基坑内填入50㎜厚的水泥砂浆和50mm厚的掺有环氧树脂胶的灌浆砂浆;S1在基坑每两块垒砌石板的缝隙处灌入掺有环氧树脂胶的灌浆砂浆;S1墙根垒砌好之后,在墙根的表面采用压力灌浆方法,将掺有环氧树脂胶的灌浆砂浆灌入垒砌石板与在基坑内之间的缝隙中,形成一道刚性防水层,这三个步骤。
Ancient building rammed earth wall waterproof and dampproof treatment method
一种古建筑夯土墙防水防潮处理方法
ZHOU LIANG (author) / ZHANG PENG (author) / XU QING (author) / HUANG KE (author) / YI LEI (author)
2020-05-19
Patent
Electronic Resource
Chinese
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
Reinforcing structure for ancient building rammed earth wall construction
European Patent Office | 2021
|Anti-crack waterproof rammed earth wall and construction method thereof
European Patent Office | 2022
|Waterproof and dampproof lifting and transverse moving parking equipment
European Patent Office | 2021
|Reinforced structure of rammed earth wall, reinforced rammed earth wall and construction method
European Patent Office | 2023
|