Towering brick structure heating-cooling dismantling method
The invention provides a towering brick structure heating-cooling dismantling method. The method comprises the steps that the height H of a towering brick structure and the farthest distance D from the outer side wall of the towering brick structure to an adjacent building are measured, and whether the top of the towering brick structure needs to be locally dismantled or not is calculated; wood edges are hammered into the bottom of the towering brick structure, and bricks are locally removed; the towering brick structure are locally heated, and specifically igniting the wood edges on the outerside of the towering brick structure; the towering brick structure is subjected to local cooling, and specifically after the wood edges are burnt out, holes appear in the wood edges at the bottom ofthe towering brick structure, and the towering brick structure integrally topples towards one sides of the holes; and local residual fire is extinguished, dumped construction waste is dismantled, thetowering brick structure is dismantled, and the bricks are recovered. According to the method, through carrying out heating-cooling on the towering brick structure, the holes of the towering brick structure can be formed through burning the wood edges, and overall dumping is achieved through the dead weight of the towering brick structure, then the towering brick structure is dismantled, and therefore the method is safe and efficient.
本发明提供了一种高耸砖构筑物升温‑降温拆除方法,包括测量高耸砖构筑物的高度H及高耸砖构筑物外侧壁到相邻建筑的最远距离D,计算是否需要对高耸砖构筑物的顶部进行局部拆除;在高耸砖构筑物底部锤入木楞,局部拆除砖块;对高耸砖构筑物进行局部升温:在高耸砖构筑物外侧点燃木楞;高耸砖构筑物局部降温:待木楞燃尽后,高耸砖构筑物底部原木楞处出现孔洞,高耸砖构筑物向孔洞一侧整体倾倒;扑灭局部残火,拆除倾倒的建筑垃圾,完成高耸构筑物拆除,回收砖块。本发明通过对高耸砖构筑物升温‑降温,燃烧木楞形成高耸砖构筑物局部孔洞,利用高耸砖构筑物自重实现整体倾倒,实现高耸砖构筑物的拆除,是一种安全、高效拆除方法。
Towering brick structure heating-cooling dismantling method
The invention provides a towering brick structure heating-cooling dismantling method. The method comprises the steps that the height H of a towering brick structure and the farthest distance D from the outer side wall of the towering brick structure to an adjacent building are measured, and whether the top of the towering brick structure needs to be locally dismantled or not is calculated; wood edges are hammered into the bottom of the towering brick structure, and bricks are locally removed; the towering brick structure are locally heated, and specifically igniting the wood edges on the outerside of the towering brick structure; the towering brick structure is subjected to local cooling, and specifically after the wood edges are burnt out, holes appear in the wood edges at the bottom ofthe towering brick structure, and the towering brick structure integrally topples towards one sides of the holes; and local residual fire is extinguished, dumped construction waste is dismantled, thetowering brick structure is dismantled, and the bricks are recovered. According to the method, through carrying out heating-cooling on the towering brick structure, the holes of the towering brick structure can be formed through burning the wood edges, and overall dumping is achieved through the dead weight of the towering brick structure, then the towering brick structure is dismantled, and therefore the method is safe and efficient.
本发明提供了一种高耸砖构筑物升温‑降温拆除方法,包括测量高耸砖构筑物的高度H及高耸砖构筑物外侧壁到相邻建筑的最远距离D,计算是否需要对高耸砖构筑物的顶部进行局部拆除;在高耸砖构筑物底部锤入木楞,局部拆除砖块;对高耸砖构筑物进行局部升温:在高耸砖构筑物外侧点燃木楞;高耸砖构筑物局部降温:待木楞燃尽后,高耸砖构筑物底部原木楞处出现孔洞,高耸砖构筑物向孔洞一侧整体倾倒;扑灭局部残火,拆除倾倒的建筑垃圾,完成高耸构筑物拆除,回收砖块。本发明通过对高耸砖构筑物升温‑降温,燃烧木楞形成高耸砖构筑物局部孔洞,利用高耸砖构筑物自重实现整体倾倒,实现高耸砖构筑物的拆除,是一种安全、高效拆除方法。
Towering brick structure heating-cooling dismantling method
高耸砖构筑物升温-降温拆除方法
RONG QIN (author) / HOU XIAOMENG (author) / WANG XIAODONG (author) / LU SHUNAN (author)
2020-05-19
Patent
Electronic Resource
Chinese