A platform for research: civil engineering, architecture and urbanism
Arch structure and construction method thereof
The invention provides an arch structure and a construction method thereof. The arch structure is arranged on two opposite constructed structures and comprises two arch seats and an arch-shaped prefabricated arch plate, the prefabricated arch plate is positioned between the two constructed structures, the spacing between the two constructed structures is not regular, the spacing between the two ends of the prefabricated arch plate is smaller than the minimum spacing between the two constructed structures so that each of the constructed structures has a gap with the end part of the prefabricated arch plate, and each arch seat is disposed between the prefabricated arch plate and the constructed structure to fill the gap. According to the arch structure and the construction method, the arch seats are arranged to fill the gap between the prefabricated arch plate and the constructed structure, the problem that the specification of the prefabricated arch plate is difficult to unify is solved, and the universality of the prefabricated arch plate is improved.
本发明提供了一种拱结构及其施工方法,所述拱结构设置于相对的两个已施工结构上,包括两个拱座及拱形的预制拱板,所述预制拱板位于两个所述已施工结构之间,两个所述已施工结构之间的间距不规则,所述预制拱板两端之间的间距小于两个所述已施工结构之间的最小间距,以使每个所述已施工结构与所述预制拱板的端部具有间隙,所述拱座设置于所述预制拱板与所述已施工结构之间以填充所述间隙。通过设置拱座填充预制拱板与已施工结构之间的间隙,解决了预制拱板规格难以统一的问题,提高了预制拱板的通用性。
Arch structure and construction method thereof
The invention provides an arch structure and a construction method thereof. The arch structure is arranged on two opposite constructed structures and comprises two arch seats and an arch-shaped prefabricated arch plate, the prefabricated arch plate is positioned between the two constructed structures, the spacing between the two constructed structures is not regular, the spacing between the two ends of the prefabricated arch plate is smaller than the minimum spacing between the two constructed structures so that each of the constructed structures has a gap with the end part of the prefabricated arch plate, and each arch seat is disposed between the prefabricated arch plate and the constructed structure to fill the gap. According to the arch structure and the construction method, the arch seats are arranged to fill the gap between the prefabricated arch plate and the constructed structure, the problem that the specification of the prefabricated arch plate is difficult to unify is solved, and the universality of the prefabricated arch plate is improved.
本发明提供了一种拱结构及其施工方法,所述拱结构设置于相对的两个已施工结构上,包括两个拱座及拱形的预制拱板,所述预制拱板位于两个所述已施工结构之间,两个所述已施工结构之间的间距不规则,所述预制拱板两端之间的间距小于两个所述已施工结构之间的最小间距,以使每个所述已施工结构与所述预制拱板的端部具有间隙,所述拱座设置于所述预制拱板与所述已施工结构之间以填充所述间隙。通过设置拱座填充预制拱板与已施工结构之间的间隙,解决了预制拱板规格难以统一的问题,提高了预制拱板的通用性。
Arch structure and construction method thereof
拱结构及其施工方法
WU XINZHI (author) / JIN JING (author) / YU WEI (author) / TENG YANFENG (author) / XU JIALE (author) / HUANG WEIDONG (author) / JIA JIMIN (author)
2020-05-29
Patent
Electronic Resource
Chinese
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
Arch bridge arch foot foundation structure, construction method thereof and arch bridge
European Patent Office | 2021
|STRUCTURE WITH ARCH STRUCTURE AND CONSTRUCTION METHOD THEREOF
European Patent Office | 2021
|