A platform for research: civil engineering, architecture and urbanism
Aluminum alloy formwork cable-stayed reinforcement device
The invention discloses an aluminum alloy formwork cable-stayed reinforcement device. The aluminum alloy formwork cable-stayed reinforcement device comprises a floor slab and an aluminum mold reinforcement back ridge. An under-cut U-shaped steel bar is pre-buried in the floor slab, a steel wire rope A obliquely penetrates through the inside of the U-shaped steel bar, the other end of the steel wire rope A is hooked on a bottle screw, and a joint is fixed through an U-shaped steel wire rope buckle; the other end of the bottle screw is hooked with a steel wire rope B, and the other end of the steel wire rope B is connected to the aluminum mold reinforcement back ridge, and a joint is fixed through an U-shaped steel wire rope buckle. According to the aluminum alloy formwork cable-stayed reinforcement device, in the direction of the floor slab, the steel wire ropes are hooked through the bottle screws, and the U-shaped steel bar is pre-buried in the floor slab; in the direction of an aluminum alloy formwork, the steel wire ropes penetrate through the aluminum mold reinforcement back ridge and is fixed and compacted through the U-shaped steel wire rope buckle, the mounting is simple, the construction is convenient, the aluminum alloy formwork cable-stayed reinforcement device is used in the concrete pouring process of a shear wall, the working efficiency can be effectively improved,the verticality of the aluminum alloy formwork is better controlled, and the molding quality of the concrete is improved.
本发明公开了一种铝合金模板斜拉加固装置,包括楼板和铝模加固背楞,所述楼板内预埋倒扣的U型钢筋,U型钢筋内斜穿钢丝绳A,钢丝绳A的另一端勾结在花篮螺栓上,其接头处通过U型钢丝绳卡扣固定;所述花篮螺栓的另一端勾结钢丝绳B,钢丝绳B的另一端连接在铝模加固背楞上,其接头处通过U型钢丝绳卡扣固定。本装置在楼板方向:通过花篮螺栓勾住钢丝绳,楼板内预埋U型钢筋;在铝合金模板方向:钢丝绳穿过铝模加固背楞,同时用U型钢丝绳卡扣固定紧实,整个装置安装简单,施工方便,在剪力墙的混凝土浇筑过程中使用本装置,能够有效的提高工作效率,较好的控制铝合金模板的垂直度,从而提高混凝土的成型质量。
Aluminum alloy formwork cable-stayed reinforcement device
The invention discloses an aluminum alloy formwork cable-stayed reinforcement device. The aluminum alloy formwork cable-stayed reinforcement device comprises a floor slab and an aluminum mold reinforcement back ridge. An under-cut U-shaped steel bar is pre-buried in the floor slab, a steel wire rope A obliquely penetrates through the inside of the U-shaped steel bar, the other end of the steel wire rope A is hooked on a bottle screw, and a joint is fixed through an U-shaped steel wire rope buckle; the other end of the bottle screw is hooked with a steel wire rope B, and the other end of the steel wire rope B is connected to the aluminum mold reinforcement back ridge, and a joint is fixed through an U-shaped steel wire rope buckle. According to the aluminum alloy formwork cable-stayed reinforcement device, in the direction of the floor slab, the steel wire ropes are hooked through the bottle screws, and the U-shaped steel bar is pre-buried in the floor slab; in the direction of an aluminum alloy formwork, the steel wire ropes penetrate through the aluminum mold reinforcement back ridge and is fixed and compacted through the U-shaped steel wire rope buckle, the mounting is simple, the construction is convenient, the aluminum alloy formwork cable-stayed reinforcement device is used in the concrete pouring process of a shear wall, the working efficiency can be effectively improved,the verticality of the aluminum alloy formwork is better controlled, and the molding quality of the concrete is improved.
本发明公开了一种铝合金模板斜拉加固装置,包括楼板和铝模加固背楞,所述楼板内预埋倒扣的U型钢筋,U型钢筋内斜穿钢丝绳A,钢丝绳A的另一端勾结在花篮螺栓上,其接头处通过U型钢丝绳卡扣固定;所述花篮螺栓的另一端勾结钢丝绳B,钢丝绳B的另一端连接在铝模加固背楞上,其接头处通过U型钢丝绳卡扣固定。本装置在楼板方向:通过花篮螺栓勾住钢丝绳,楼板内预埋U型钢筋;在铝合金模板方向:钢丝绳穿过铝模加固背楞,同时用U型钢丝绳卡扣固定紧实,整个装置安装简单,施工方便,在剪力墙的混凝土浇筑过程中使用本装置,能够有效的提高工作效率,较好的控制铝合金模板的垂直度,从而提高混凝土的成型质量。
Aluminum alloy formwork cable-stayed reinforcement device
一种铝合金模板斜拉加固装置
YUE YACHAO (author)
2020-06-02
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Formwork climbing device for cable-stayed bridge tower construction
European Patent Office | 2024
|HYDRAULIC SELF-ELEVATING INTEGRATED CABLE-STAYED BRIDGE LIFTING FORMWORK
European Patent Office | 2022
|Hydraulic self-elevating integrated cable-stayed bridge lifting formwork
European Patent Office | 2020
|