A platform for research: civil engineering, architecture and urbanism
Spliced prefabricated steel concrete beam bridge deck
A spliced prefabricated steel concrete beam bridge deck comprises a prefabricated concrete slab body and end steel plates, and the end steel plates are arranged at the two longitudinal ends of the prefabricated concrete slab body. Each end steel plate comprises a welding part, a connecting part and a reinforcing part, the welding part is used for welding two adjacent end steel plates, the connecting part is used for connecting the end steel plates and the precast concrete plate body, the reinforcing part is used for reinforcing the connecting strength of the connecting positions of the two endsteel plates, the welding part is arranged at the upper end of the connecting part, the reinforcing part is arranged at the lower end of the connecting part, and the welding part, the connecting partand the reinforcing part are located on the same plate surface. The bridge deck slab is good in integrity and can work together with a steel beam after being effectively connected, post-cast strip concrete at the position of the connecting piece has good performance, and effective connection of the bridge deck slab and the steel beam is guaranteed.
一种拼装式预制钢混梁桥面板,包括预制混凝土板本体和端部钢板,端部钢板设置于预制混凝土板本体纵向两端;端部钢板包括焊接部、连接部和加强部,焊接部用于焊接两相邻的端部钢板,连接部用于连接端部钢板和预制混凝土板本体,加强部用于加强两端部钢板连接位置的连接强度,焊接部设置于连接部上端,加强部设置于连接部下端,焊接部、连接部和加强部位于同一板面。本桥面板整体性好,可与钢梁进行有效连接后共同工作,连接件处后浇带混凝土具有良好性能,保证桥面板与钢梁的有效连接。
Spliced prefabricated steel concrete beam bridge deck
A spliced prefabricated steel concrete beam bridge deck comprises a prefabricated concrete slab body and end steel plates, and the end steel plates are arranged at the two longitudinal ends of the prefabricated concrete slab body. Each end steel plate comprises a welding part, a connecting part and a reinforcing part, the welding part is used for welding two adjacent end steel plates, the connecting part is used for connecting the end steel plates and the precast concrete plate body, the reinforcing part is used for reinforcing the connecting strength of the connecting positions of the two endsteel plates, the welding part is arranged at the upper end of the connecting part, the reinforcing part is arranged at the lower end of the connecting part, and the welding part, the connecting partand the reinforcing part are located on the same plate surface. The bridge deck slab is good in integrity and can work together with a steel beam after being effectively connected, post-cast strip concrete at the position of the connecting piece has good performance, and effective connection of the bridge deck slab and the steel beam is guaranteed.
一种拼装式预制钢混梁桥面板,包括预制混凝土板本体和端部钢板,端部钢板设置于预制混凝土板本体纵向两端;端部钢板包括焊接部、连接部和加强部,焊接部用于焊接两相邻的端部钢板,连接部用于连接端部钢板和预制混凝土板本体,加强部用于加强两端部钢板连接位置的连接强度,焊接部设置于连接部上端,加强部设置于连接部下端,焊接部、连接部和加强部位于同一板面。本桥面板整体性好,可与钢梁进行有效连接后共同工作,连接件处后浇带混凝土具有良好性能,保证桥面板与钢梁的有效连接。
Spliced prefabricated steel concrete beam bridge deck
一种拼接式预制钢混梁桥面板
BAN XINLIN (author) / LI WANGWANG (author) / SU YONGHUA (author) / GE KAI (author) / TAO XIAOYAN (author) / SHI LONG (author) / YIN JING (author) / YUAN LEI (author) / LIU JIYUAN (author) / LI CHENGJUN (author)
2020-06-05
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
Steel concrete beam bridge deck slab prefabricated construction method
European Patent Office | 2020
|Prefabricated bridge deck steel-concrete composite beam construction method
European Patent Office | 2021
|European Patent Office | 2022
|Prefabricated assembly type steel-concrete composite beam guardrail bridge deck structure
European Patent Office | 2021
|