A platform for research: civil engineering, architecture and urbanism
The invention discloses a bridge pier column deviation rectifying and resetting device. The device comprises a sliding frame placed at the upper end of a column top cover beam, a beam body is arrangedat the upper end of the sliding frame, and a first fixing mechanism used for fixing the beam body is arranged at the upper end of the sliding frame. The invention further provides a bridge pier column deviation rectifying and resetting method, which comprises the following steps of: S1, installing the device, placing the sliding frame at the upper end of the column top cover beam, placing the beam body on the sliding frame, and fixing the beam body through the first fixing mechanism; and S2, fixing a mounting plate to a side edge of the column top cover beam through a second fixing mechanism.According to the invention, the beam body can be fixed, the beam body can be effectively prevented from deviating when deviation rectifying and resetting are conducted on the beam body, the moving distance of the beam body can be adjusted according to different deviation rectifying and resetting requirements, and the working efficiency is improved.
本发明公开了一种桥梁墩柱纠偏复位装置,包括放置在柱顶盖梁上端的滑动架,且梁体设置在滑动架的上端,所述滑动架的上端设置有用于对梁体进行固定的第一固定机构。本发明还提出一种桥梁墩柱纠偏复位方法,包括以下步骤:S1、对设备进行安装,将滑动架放置在柱顶盖梁的上端,并将梁体放置在滑动架上,通过第一固定机构对梁体进行固定;S2、通过第二固定机构将安装板固定在柱顶盖梁的侧边上。本发明可对梁体进行固定,有效的防止在对梁体进行纠偏复位时梁体发生偏移,可对梁体进行固定,有效的防止在对梁体进行纠偏复位时梁体发生偏移,并可根据不同的纠偏复位需求来调整梁体的移动距离,提高了工作效率。
The invention discloses a bridge pier column deviation rectifying and resetting device. The device comprises a sliding frame placed at the upper end of a column top cover beam, a beam body is arrangedat the upper end of the sliding frame, and a first fixing mechanism used for fixing the beam body is arranged at the upper end of the sliding frame. The invention further provides a bridge pier column deviation rectifying and resetting method, which comprises the following steps of: S1, installing the device, placing the sliding frame at the upper end of the column top cover beam, placing the beam body on the sliding frame, and fixing the beam body through the first fixing mechanism; and S2, fixing a mounting plate to a side edge of the column top cover beam through a second fixing mechanism.According to the invention, the beam body can be fixed, the beam body can be effectively prevented from deviating when deviation rectifying and resetting are conducted on the beam body, the moving distance of the beam body can be adjusted according to different deviation rectifying and resetting requirements, and the working efficiency is improved.
本发明公开了一种桥梁墩柱纠偏复位装置,包括放置在柱顶盖梁上端的滑动架,且梁体设置在滑动架的上端,所述滑动架的上端设置有用于对梁体进行固定的第一固定机构。本发明还提出一种桥梁墩柱纠偏复位方法,包括以下步骤:S1、对设备进行安装,将滑动架放置在柱顶盖梁的上端,并将梁体放置在滑动架上,通过第一固定机构对梁体进行固定;S2、通过第二固定机构将安装板固定在柱顶盖梁的侧边上。本发明可对梁体进行固定,有效的防止在对梁体进行纠偏复位时梁体发生偏移,可对梁体进行固定,有效的防止在对梁体进行纠偏复位时梁体发生偏移,并可根据不同的纠偏复位需求来调整梁体的移动距离,提高了工作效率。
Bridge pier column deviation rectifying and resetting device and deviation rectifying and resetting method
一种桥梁墩柱纠偏复位装置及纠偏复位方法
LU YANWEI (author)
2020-06-09
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
Bridge pier column deviation rectifying and resetting device
European Patent Office | 2021
|Bridge pier column deviation rectifying and resetting device
European Patent Office | 2020
|Bridge pier column deviation rectifying and resetting device
European Patent Office | 2023
|Bridge pier column deviation rectifying device and deviation rectifying method
European Patent Office | 2023
|Inclined wooden column resetting and deviation rectifying device
European Patent Office | 2024
|