A platform for research: civil engineering, architecture and urbanism
The invention discloses a construction method for arranging a dividing joint of a roof. The method comprises the following steps that S1, a finished product galvanization iron sheet is cut into a pre-determined size through scissors according to the length and width required by a drawing and a standard; S2, the cut galvanization iron sheet is firmly welded through an electric welding machine; S3,the processed dividing joint device is fixedly arranged according to the vertical-horizontal spacing of 6 meters; S4, before crack pouring with factice is performed, transparent adhesive tape is attached to the two sides of the dividing joint. The construction method for arranging the dividing joint of the roof is easy and convenient to operate, the labor efficiency is improved, and thus the construction method has a good economic environment and an occupational health safety production environment. According to the construction method, the projects, with high demands for the construction period and quality, in the construction projects (particularly large roof projects) can be simplified, and convenience is provided for usage of a user.
本发明公开一种屋面分格缝设置的施工方法,包括如下步骤:S1、将成品的镀锌铁皮按照图纸和规范要求长、宽用剪刀进行裁剪成预定尺寸;S2、将裁剪好的镀锌铁皮用电焊机进行焊接牢固;S3、将加工好的分格缝装置按照每6m的纵横间距进行设置固定;S4、在进行油膏灌缝前,在分格缝二侧用透明胶布沿分格缝二侧通长贴。该屋面分格缝设置的施工方法,操作简便,提高了劳动效率,因此本发明具有良好的经济环境和职业健康安全生产环境。本发明既能将建设工程(尤其是较大的屋面工程)中,对工期、质量要求高的工程,进行简化,方便了使用者的使用。
The invention discloses a construction method for arranging a dividing joint of a roof. The method comprises the following steps that S1, a finished product galvanization iron sheet is cut into a pre-determined size through scissors according to the length and width required by a drawing and a standard; S2, the cut galvanization iron sheet is firmly welded through an electric welding machine; S3,the processed dividing joint device is fixedly arranged according to the vertical-horizontal spacing of 6 meters; S4, before crack pouring with factice is performed, transparent adhesive tape is attached to the two sides of the dividing joint. The construction method for arranging the dividing joint of the roof is easy and convenient to operate, the labor efficiency is improved, and thus the construction method has a good economic environment and an occupational health safety production environment. According to the construction method, the projects, with high demands for the construction period and quality, in the construction projects (particularly large roof projects) can be simplified, and convenience is provided for usage of a user.
本发明公开一种屋面分格缝设置的施工方法,包括如下步骤:S1、将成品的镀锌铁皮按照图纸和规范要求长、宽用剪刀进行裁剪成预定尺寸;S2、将裁剪好的镀锌铁皮用电焊机进行焊接牢固;S3、将加工好的分格缝装置按照每6m的纵横间距进行设置固定;S4、在进行油膏灌缝前,在分格缝二侧用透明胶布沿分格缝二侧通长贴。该屋面分格缝设置的施工方法,操作简便,提高了劳动效率,因此本发明具有良好的经济环境和职业健康安全生产环境。本发明既能将建设工程(尤其是较大的屋面工程)中,对工期、质量要求高的工程,进行简化,方便了使用者的使用。
Roof dividing joint partition device and construction method thereof
European Patent Office | 2023
|Product for roof waterproof protective layer dividing joint construction and construction method
European Patent Office | 2020
|Fine aggregate concrete roof double-glass strip dividing joint construction method
European Patent Office | 2015
|