The invention discloses a unit curtain wall lifting process, and relates to the technical field of curtain wall construction. According to technical scheme key points, the unit curtain wall lifting process comprises the following steps that S1, a guiding frame vertically and downwards extending is mounted on a building outer wall, the interior of the guiding frame just can allow a single curtain wall plate to move in the vertical direction, the guiding frame corresponds to the position of the to-be-mounted curtain wall plate, and the top end of the guiding frame is located on the roof; S2, thecurtain wall plate on the roof is lifted through hoisting equipment, and placed in the guiding frame from the top end of the guiding frame; S3, the hoisting equipment controls the curtain wall plateto drop to a to-be-mounted predetermined height; S4, mounting personnel mount the curtain wall plate into a fixing frame; and S5, the mounting personnel separate the curtain wall plate from the hoisting equipment. According to the lifting process, by arranging the guiding frame, the situation that the curtain wall plate collides with a building structure during lifting can be avoided to a great extent, even in a high wind environment, the curtain wall plate is also not prone to shaking during lifting, and thus the safety of lifting operation is greatly improved.
本发明公开了一种单元幕墙吊装工艺,涉及幕墙施工技术领域,其技术方案要点是:包括以下步骤:步骤S1:在建筑外墙安装竖直向下延伸的导向架,导向架内恰好能供单块幕墙板沿竖向移动,导向架对应待安装幕墙板的位置,导向架的顶端位于楼顶;步骤S2:用起重设备将楼顶的幕墙板吊起,将幕墙板从导向架的顶端放入导向架内;步骤S3:起重设备控制幕墙板降至待安装的预定高度;步骤S4:安装人员将幕墙板安装于固定框架内;步骤S5:安装人员将幕墙板与起重设备分离。本吊装工艺通过设置导向架,能在很大程度上避免幕墙板吊装时与建筑结构产生碰撞,即使在大风环境下,幕墙板的吊装也不易产生晃动,极大地提升了吊装作业的安全性。
The invention discloses a unit curtain wall lifting process, and relates to the technical field of curtain wall construction. According to technical scheme key points, the unit curtain wall lifting process comprises the following steps that S1, a guiding frame vertically and downwards extending is mounted on a building outer wall, the interior of the guiding frame just can allow a single curtain wall plate to move in the vertical direction, the guiding frame corresponds to the position of the to-be-mounted curtain wall plate, and the top end of the guiding frame is located on the roof; S2, thecurtain wall plate on the roof is lifted through hoisting equipment, and placed in the guiding frame from the top end of the guiding frame; S3, the hoisting equipment controls the curtain wall plateto drop to a to-be-mounted predetermined height; S4, mounting personnel mount the curtain wall plate into a fixing frame; and S5, the mounting personnel separate the curtain wall plate from the hoisting equipment. According to the lifting process, by arranging the guiding frame, the situation that the curtain wall plate collides with a building structure during lifting can be avoided to a great extent, even in a high wind environment, the curtain wall plate is also not prone to shaking during lifting, and thus the safety of lifting operation is greatly improved.
本发明公开了一种单元幕墙吊装工艺,涉及幕墙施工技术领域,其技术方案要点是:包括以下步骤:步骤S1:在建筑外墙安装竖直向下延伸的导向架,导向架内恰好能供单块幕墙板沿竖向移动,导向架对应待安装幕墙板的位置,导向架的顶端位于楼顶;步骤S2:用起重设备将楼顶的幕墙板吊起,将幕墙板从导向架的顶端放入导向架内;步骤S3:起重设备控制幕墙板降至待安装的预定高度;步骤S4:安装人员将幕墙板安装于固定框架内;步骤S5:安装人员将幕墙板与起重设备分离。本吊装工艺通过设置导向架,能在很大程度上避免幕墙板吊装时与建筑结构产生碰撞,即使在大风环境下,幕墙板的吊装也不易产生晃动,极大地提升了吊装作业的安全性。
Unit curtain wall lifting process
一种单元幕墙吊装工艺
ZHUO YIFEI (author)
2020-06-16
Patent
Electronic Resource
Chinese
Curtain wall unit, curtain wall and curtain wall unit assembling method
European Patent Office | 2024
|Curtain wall unit, curtain wall and curtain wall unit assembling method
European Patent Office | 2021
|Curtain wall unit, curtain wall and curtain wall unit assembling method
European Patent Office | 2020
|