A platform for research: civil engineering, architecture and urbanism
Integral dry hanging process of earthenware brick curtain wall
The invention discloses an integral dry hanging process of an earthenware brick curtain wall. The process comprises the following steps of: step 1, embedding a Hafen groove embedded part in a buildingwall body, and exposing a notch of the Hafen groove embedded part; step 2, assembling the head of a T-shaped bolt in a C-shaped groove of the Hafen groove embedded part; step 3, fixedly connecting asteel support with the Hafen groove embedded part through a T-shaped bolt; step 4, welding a steel square tube of a prefabricated unit wall body with a connecting column; and step 5, carrying out three-dimensional adjustment on the installation position of the prefabricated unit wall body through the steel support. An overhanging structural plate is not needed during installation, main structure construction is more convenient, the steel support can realize three-dimensional adjustment on the position of the prefabricated unit wall body, the installation precision can reach the millimeter level, and the construction quality of the earthenware brick curtain wall is guaranteed. In the factory stage, perforated earthenware bricks and a steel frame are made into the prefabricated unit wall body, the machining precision is high, the field installation is simple and convenient, the construction speed is high, and the construction period is greatly shortened.
本发明公开了一种陶砖幕墙整体干挂工艺,包括以下步骤:步骤一、将哈芬槽预埋件埋覆于建筑物墙体中,哈芬槽预埋件的槽口暴露;步骤二、T型螺栓的头部装配于哈芬槽预埋件的C型槽内;步骤三、将钢支座通过T型螺栓与哈芬槽预埋件固定连接;步骤四、将预制单元墙体的钢方管与连接柱焊接;步骤五、通过钢支座对预制单元墙体的安装位置进行三维调节。本发明在安装时不需要做外挑结构板,主体结构施工更加方便,钢支座能够实现对预制单元墙体位置的三维调节,安装精度能够达到毫米级,保证了陶砖幕墙的施工质量。在工厂阶段将带孔陶砖与钢框架做成预制单元墙体,加工精度高,现场安装简便,施工速度快,极大地缩短了施工周期。
Integral dry hanging process of earthenware brick curtain wall
The invention discloses an integral dry hanging process of an earthenware brick curtain wall. The process comprises the following steps of: step 1, embedding a Hafen groove embedded part in a buildingwall body, and exposing a notch of the Hafen groove embedded part; step 2, assembling the head of a T-shaped bolt in a C-shaped groove of the Hafen groove embedded part; step 3, fixedly connecting asteel support with the Hafen groove embedded part through a T-shaped bolt; step 4, welding a steel square tube of a prefabricated unit wall body with a connecting column; and step 5, carrying out three-dimensional adjustment on the installation position of the prefabricated unit wall body through the steel support. An overhanging structural plate is not needed during installation, main structure construction is more convenient, the steel support can realize three-dimensional adjustment on the position of the prefabricated unit wall body, the installation precision can reach the millimeter level, and the construction quality of the earthenware brick curtain wall is guaranteed. In the factory stage, perforated earthenware bricks and a steel frame are made into the prefabricated unit wall body, the machining precision is high, the field installation is simple and convenient, the construction speed is high, and the construction period is greatly shortened.
本发明公开了一种陶砖幕墙整体干挂工艺,包括以下步骤:步骤一、将哈芬槽预埋件埋覆于建筑物墙体中,哈芬槽预埋件的槽口暴露;步骤二、T型螺栓的头部装配于哈芬槽预埋件的C型槽内;步骤三、将钢支座通过T型螺栓与哈芬槽预埋件固定连接;步骤四、将预制单元墙体的钢方管与连接柱焊接;步骤五、通过钢支座对预制单元墙体的安装位置进行三维调节。本发明在安装时不需要做外挑结构板,主体结构施工更加方便,钢支座能够实现对预制单元墙体位置的三维调节,安装精度能够达到毫米级,保证了陶砖幕墙的施工质量。在工厂阶段将带孔陶砖与钢框架做成预制单元墙体,加工精度高,现场安装简便,施工速度快,极大地缩短了施工周期。
Integral dry hanging process of earthenware brick curtain wall
一种陶砖幕墙整体干挂工艺
LIAN ZHEN (author) / SUN YANCHUN (author) / CHEN YONGQUAN (author) / LI FEN (author) / LIU SHAOYU (author) / CHE ZHAOGUO (author) / ZHANG TAO (author) / JIANG YINI (author) / ZHOU YIFANG (author)
2020-06-16
Patent
Electronic Resource
Chinese
Movable earthenware brick and earthenware brick curtain wall
European Patent Office | 2024
|Earthenware brick curtain wall structure and earthenware brick curtain wall construction method
European Patent Office | 2023
|Open type dry hanging earthenware brick curtain wall system and construction method thereof
European Patent Office | 2024
|Hollow earthenware brick curtain wall structure and construction process
European Patent Office | 2022
|