A platform for research: civil engineering, architecture and urbanism
The invention relates to the technical field of wall building, in particular to a masonry engineering construction process. The masonry engineering construction process comprises the following steps that S1, a reinforcement cage is built; S2, a constructional column I is constructed; 3, a height pole is set; and 4, a wall body is constructed. The masonry engineering construction process has the effects that the strength of the constructed wall body can be improved, and the quality of the constructed wall body is guaranteed.
本发明涉及砌墙的技术领域,尤其是涉及一种砌筑工程施工工艺,包括以下步骤:步骤一、搭建钢筋笼;步骤二、构造柱一搭建;步骤三、设置皮数杆;步骤四、墙体砌筑,本发明具有能够提高砌筑墙体的强度,保证砌筑后墙体的质量的效果。
The invention relates to the technical field of wall building, in particular to a masonry engineering construction process. The masonry engineering construction process comprises the following steps that S1, a reinforcement cage is built; S2, a constructional column I is constructed; 3, a height pole is set; and 4, a wall body is constructed. The masonry engineering construction process has the effects that the strength of the constructed wall body can be improved, and the quality of the constructed wall body is guaranteed.
本发明涉及砌墙的技术领域,尤其是涉及一种砌筑工程施工工艺,包括以下步骤:步骤一、搭建钢筋笼;步骤二、构造柱一搭建;步骤三、设置皮数杆;步骤四、墙体砌筑,本发明具有能够提高砌筑墙体的强度,保证砌筑后墙体的质量的效果。
Masonry engineering construction process
一种砌筑工程施工工艺
MAO CHONG (author)
2020-06-19
Patent
Electronic Resource
Chinese
Masonry engineering construction device and construction process
European Patent Office | 2021
|Building masonry material and masonry construction process thereof
European Patent Office | 2023
|