A platform for research: civil engineering, architecture and urbanism
Pipeline opening limiting device and limiting method for concrete pouring pipeline of high-rise building
The invention discloses a pipeline opening limiting device and limiting method for a concrete pouring pipeline of a high-rise building. The pipeline opening limiting device comprises an anti-deformation top layer frame, wherein a fixing ring is arranged above the anti-deformation top layer frame, and a plurality of vertical supporting rods are arranged below the anti-deformation top layer frame; sliding wheel frames are evenly distributed along the edge of the anti-deformation top layer frame, tensioning ropes are arranged on the sliding wheel frames, one ends of the tensioning ropes are fixedto the fixing ring, and tensioning assemblies capable of tightening the tensioning ropes are arranged at the other ends of the tensioning ropes; and telescopic supporting columns are arranged below the tensioning assemblies, the upper ends of the telescopic supporting columns are fixed to the tensioning assemblies, and the lower ends of the telescopic supporting columns are fixed to the top layerof the building. Through the limiting device and the limiting method, a pipeline opening of the concrete pouring pipeline of the high-rise building can be effectively limited, the safety risk of constructors is effectively reduced, and concrete is poured on a pouring surface more stably and accurately.
本发明公开了一种高层建筑混凝土浇筑管道管口限位装置及限位方法,包括防变形顶层架,所述防变形顶层架的上方设有固定环,防变形顶层架的下方设有若干根立式支撑杆,所述滑轮架沿防变形顶层架的边缘均匀分布,在滑轮架上设有拉紧绳,所述拉紧绳的一端与固定环固定,拉紧绳的另一端设有能够收紧拉紧绳的拉紧组件,所述拉紧组件的下方设有伸缩支撑柱,所述伸缩支撑柱的上端与拉紧组件固定,伸缩支撑柱的下端与建筑顶层固定;通过限位装置及限位方法能够有效的对高层建筑混凝土浇筑管道管口的限制,并且有效的减小了施工人员的安全风险并且使得混凝土更加稳定准确的浇筑在浇筑面上。
Pipeline opening limiting device and limiting method for concrete pouring pipeline of high-rise building
The invention discloses a pipeline opening limiting device and limiting method for a concrete pouring pipeline of a high-rise building. The pipeline opening limiting device comprises an anti-deformation top layer frame, wherein a fixing ring is arranged above the anti-deformation top layer frame, and a plurality of vertical supporting rods are arranged below the anti-deformation top layer frame; sliding wheel frames are evenly distributed along the edge of the anti-deformation top layer frame, tensioning ropes are arranged on the sliding wheel frames, one ends of the tensioning ropes are fixedto the fixing ring, and tensioning assemblies capable of tightening the tensioning ropes are arranged at the other ends of the tensioning ropes; and telescopic supporting columns are arranged below the tensioning assemblies, the upper ends of the telescopic supporting columns are fixed to the tensioning assemblies, and the lower ends of the telescopic supporting columns are fixed to the top layerof the building. Through the limiting device and the limiting method, a pipeline opening of the concrete pouring pipeline of the high-rise building can be effectively limited, the safety risk of constructors is effectively reduced, and concrete is poured on a pouring surface more stably and accurately.
本发明公开了一种高层建筑混凝土浇筑管道管口限位装置及限位方法,包括防变形顶层架,所述防变形顶层架的上方设有固定环,防变形顶层架的下方设有若干根立式支撑杆,所述滑轮架沿防变形顶层架的边缘均匀分布,在滑轮架上设有拉紧绳,所述拉紧绳的一端与固定环固定,拉紧绳的另一端设有能够收紧拉紧绳的拉紧组件,所述拉紧组件的下方设有伸缩支撑柱,所述伸缩支撑柱的上端与拉紧组件固定,伸缩支撑柱的下端与建筑顶层固定;通过限位装置及限位方法能够有效的对高层建筑混凝土浇筑管道管口的限制,并且有效的减小了施工人员的安全风险并且使得混凝土更加稳定准确的浇筑在浇筑面上。
Pipeline opening limiting device and limiting method for concrete pouring pipeline of high-rise building
高层建筑混凝土浇筑管道管口限位装置及限位方法
HUANG CHAO (author) / ZHOU LINCHENG (author) / XIA SONGLIN (author) / DAI ZONGYU (author) / ZENG JIE (author) / HE SHIMIN (author)
2020-06-19
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Pipeline reserved opening concrete pouring mold and demolding assembly
European Patent Office | 2024
|Protective limiting device for bent part of building drainage pipeline
European Patent Office | 2022
|