Construction method of silo roof cantilever plate
The invention relates to the technical field of building construction, in particular to a construction method of a silo roof cantilever plate. The construction method comprises the following steps that when slip form construction is conducted about 1m of the top of a silo, a vertical fixing rod is pre-buried on the side wall of the silo, and a roof bottom template is installed at the top of the silo after the slip form is completed and a slip form system is dismantled; then a safety rope is installed on the vertical fixing rod, a hanging bracket is assembled in sections, the hanging bracket isinstalled to form a cantilever plate operating platform, a cantilever bottom template is installed on the cantilever plate operating platform, a side template is installed on the outer side of the cantilever bottom template, and integrally binding of the roof panel and cantilever plate reinforcing steel bars as well as integrally pouring concrete of the roof panel and the cantilever plate are carried out. Therefore, the construction of the roof panel and the cantilever plate can be completed safely, simply and efficiently with guaranteed quality and quantity; and the construction method is low in cost, easy to operate and high in practicability.
本发明涉及建筑施工技术领域,尤其涉及一种筒仓屋面悬挑板的施工方法,通过在滑模施工至筒仓顶部1m左右时,于筒仓侧壁预埋竖直固定杆,并在滑模完成、拆除滑模系统后于所述筒仓的顶部安装屋面底模板,然后于竖直固定杆上安装安全绳,之后分段组装吊架,并进行吊架安装形成悬挑板操作平台,然后在悬挑板操作平台安装悬挑底模板、于该悬挑底模板的外侧安装侧模板,之后进行屋面板及悬挑板钢筋整体绑扎及屋面板及悬挑板混凝土整体浇筑;从而能够安全、简单、高效、保质保量地完成屋面板及悬挑板的施工;且该施工方法成本低廉,易于操作,具有很强的实用性。
Construction method of silo roof cantilever plate
The invention relates to the technical field of building construction, in particular to a construction method of a silo roof cantilever plate. The construction method comprises the following steps that when slip form construction is conducted about 1m of the top of a silo, a vertical fixing rod is pre-buried on the side wall of the silo, and a roof bottom template is installed at the top of the silo after the slip form is completed and a slip form system is dismantled; then a safety rope is installed on the vertical fixing rod, a hanging bracket is assembled in sections, the hanging bracket isinstalled to form a cantilever plate operating platform, a cantilever bottom template is installed on the cantilever plate operating platform, a side template is installed on the outer side of the cantilever bottom template, and integrally binding of the roof panel and cantilever plate reinforcing steel bars as well as integrally pouring concrete of the roof panel and the cantilever plate are carried out. Therefore, the construction of the roof panel and the cantilever plate can be completed safely, simply and efficiently with guaranteed quality and quantity; and the construction method is low in cost, easy to operate and high in practicability.
本发明涉及建筑施工技术领域,尤其涉及一种筒仓屋面悬挑板的施工方法,通过在滑模施工至筒仓顶部1m左右时,于筒仓侧壁预埋竖直固定杆,并在滑模完成、拆除滑模系统后于所述筒仓的顶部安装屋面底模板,然后于竖直固定杆上安装安全绳,之后分段组装吊架,并进行吊架安装形成悬挑板操作平台,然后在悬挑板操作平台安装悬挑底模板、于该悬挑底模板的外侧安装侧模板,之后进行屋面板及悬挑板钢筋整体绑扎及屋面板及悬挑板混凝土整体浇筑;从而能够安全、简单、高效、保质保量地完成屋面板及悬挑板的施工;且该施工方法成本低廉,易于操作,具有很强的实用性。
Construction method of silo roof cantilever plate
一种筒仓屋面悬挑板的施工方法
TANG ZHONG (author) / SHANG XIUMIN (author) / ZHANG JINLIAN (author)
2020-06-19
Patent
Electronic Resource
Chinese
CONSTRUCTION METHOD OF SILO ROOF SECTION, AND SILO ROOF STRUCTURE
European Patent Office | 2018
|Roof structure of prestressed silo, prestressed silo and construction method of roof structure
European Patent Office | 2024
|Large-span silo roof construction platform and erecting method
European Patent Office | 2021
|Cement silo middle column and cement silo roof mounting method
European Patent Office | 2024
|