Bridge pier column deviation rectifying device capable of accurately controlling pier column displacement
The invention relates to the technical field of bridge deviation rectification, and discloses a bridge pier column deviation rectification device capable of accurately controlling pier column displacement, the bridge pier column deviation rectification device comprises a base, a high-power motor, a first right fixing block and a first guide rod, and the right side of the base is fixedly connectedwith the left end of the high-power motor. The invention discloses a bridge pier column deviation rectifying device capable of accurately controlling pier column displacement. A first transmission screw rod, a second transmission screw rod, a first quantity limiting plate, a second quantity limiting plate, a linkage rod and the like are arranged; the high-power motor drives the first transmissionscrew to rotate; the linkage rod rotates and drives the second transmission screw to rotate through the second belt; namely, the first limiting plate and the second limiting plate can be pushed by thefirst pushing block and the second pushing block to simultaneously move close to each other at the same displacement; the device is simple in structure and convenient to operate, can be matched withjacking deviation of a jack, facilitates subsequent reinforcing work, and solves the problems that an existing device cannot accurately control the displacement amount. Meanwhile, a pier stud cannot be prevented from rebounding, and pier stud reinforcing work is difficult.
本发明涉及桥梁纠偏技术领域,且公开了一种能够精确控制墩柱位移量的桥梁墩柱纠偏装置,包括底座、大功率电机、第一右固定块和第一导向杆,所述底座的右侧与大功率电机的左端固定连接。该能够精确控制墩柱位移量的桥梁墩柱纠偏装置,通过设置第一传动螺杆、第二传动螺杆、第一限量板、第二限量板和联动杆等,通过大功率电机带动第一传动螺杆转动,联动杆转动并通过第二皮带带动第二传动螺杆转动,即第一限量板和第二限量板可同时在第一推进块和第二推进块的推动下同时同位移量的靠近移动,可配合跟随千斤顶的顶压偏移,便于后续的加固工作,解决了当前的装置不能够在精确控制位移量的同时,防止墩柱进行反弹,墩柱加固工作困难的问题。
Bridge pier column deviation rectifying device capable of accurately controlling pier column displacement
The invention relates to the technical field of bridge deviation rectification, and discloses a bridge pier column deviation rectification device capable of accurately controlling pier column displacement, the bridge pier column deviation rectification device comprises a base, a high-power motor, a first right fixing block and a first guide rod, and the right side of the base is fixedly connectedwith the left end of the high-power motor. The invention discloses a bridge pier column deviation rectifying device capable of accurately controlling pier column displacement. A first transmission screw rod, a second transmission screw rod, a first quantity limiting plate, a second quantity limiting plate, a linkage rod and the like are arranged; the high-power motor drives the first transmissionscrew to rotate; the linkage rod rotates and drives the second transmission screw to rotate through the second belt; namely, the first limiting plate and the second limiting plate can be pushed by thefirst pushing block and the second pushing block to simultaneously move close to each other at the same displacement; the device is simple in structure and convenient to operate, can be matched withjacking deviation of a jack, facilitates subsequent reinforcing work, and solves the problems that an existing device cannot accurately control the displacement amount. Meanwhile, a pier stud cannot be prevented from rebounding, and pier stud reinforcing work is difficult.
本发明涉及桥梁纠偏技术领域,且公开了一种能够精确控制墩柱位移量的桥梁墩柱纠偏装置,包括底座、大功率电机、第一右固定块和第一导向杆,所述底座的右侧与大功率电机的左端固定连接。该能够精确控制墩柱位移量的桥梁墩柱纠偏装置,通过设置第一传动螺杆、第二传动螺杆、第一限量板、第二限量板和联动杆等,通过大功率电机带动第一传动螺杆转动,联动杆转动并通过第二皮带带动第二传动螺杆转动,即第一限量板和第二限量板可同时在第一推进块和第二推进块的推动下同时同位移量的靠近移动,可配合跟随千斤顶的顶压偏移,便于后续的加固工作,解决了当前的装置不能够在精确控制位移量的同时,防止墩柱进行反弹,墩柱加固工作困难的问题。
Bridge pier column deviation rectifying device capable of accurately controlling pier column displacement
一种能够精确控制墩柱位移量的桥梁墩柱纠偏装置
ZHANG HAILONG (author) / ZHANG YING (author) / WANG WENSHENG (author) / LI YUNJIE (author) / WANG WEI (author) / MA DONGBEI (author) / WANG HONGCHAO (author) / WANG YUJIA (author) / ZHANG CHUNSHUANG (author) / GAO YANG (author)
2020-06-26
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
European Patent Office | 2023
|Bridge pier column deviation rectifying device and deviation rectifying method
European Patent Office | 2023
|Bridge pier column deviation rectifying and resetting device
European Patent Office | 2021
|Bridge pier column deviation rectifying and resetting device
European Patent Office | 2020
|