Construction process for connecting and fixing water supply and drainage pipe in building construction
The invention relates to a construction process for connecting and fixing a water supply and drainage pipe in building construction. The construction process is completed by being mainly matched witha water supply and drainage pipe connecting and fixing bracket in building construction installation engineering. The construction process for connecting and fixing the water supply and drainage pipein building construction comprises the following steps of S1, installation position construction: excavating a construction space required by required pipelines through an existing excavator and labormatching mode; S2, pipeline placing: transversely and uniformly arranging and placing the prepared pipelines in parallel in the construction space; and S3, pipeline installation: fixing and connecting every two adjacent pipelines through the water supply and drainage pipe connecting and fixing bracket in building construction installation engineering. The construction process can adapt to pipeline installation at different intervals through a rotary tightening device or an auxiliary clamping device, and the measuring range of the auxiliary clamping device can be changed by adjusting the position of a moving plate on the auxiliary clamping device.
本发明涉及一种建筑施工给排水管连接固定施工工艺,其主要利用了一种建筑施工安装工程给排水管连接固定支架配合完成,该建筑施工给排水管连接固定施工工艺具体包括以下步骤:S1、安装位置施工:通过现有挖掘机与人工配合方式挖掘出所需管道所需施工空间;S2、管道安放:将准备好的管道横向均匀并列排布安放在施工空间内;S3、管道安装:相邻两个管道之间通过所述建筑施工安装工程给排水管连接固定支架进行固定连接;本发明通过转动收紧装置或者辅助夹紧装置可以适应不同间隔的管道安装,通过调整辅助夹紧装置上移动板的位置可以改变辅助夹紧装置的量程。
Construction process for connecting and fixing water supply and drainage pipe in building construction
The invention relates to a construction process for connecting and fixing a water supply and drainage pipe in building construction. The construction process is completed by being mainly matched witha water supply and drainage pipe connecting and fixing bracket in building construction installation engineering. The construction process for connecting and fixing the water supply and drainage pipein building construction comprises the following steps of S1, installation position construction: excavating a construction space required by required pipelines through an existing excavator and labormatching mode; S2, pipeline placing: transversely and uniformly arranging and placing the prepared pipelines in parallel in the construction space; and S3, pipeline installation: fixing and connecting every two adjacent pipelines through the water supply and drainage pipe connecting and fixing bracket in building construction installation engineering. The construction process can adapt to pipeline installation at different intervals through a rotary tightening device or an auxiliary clamping device, and the measuring range of the auxiliary clamping device can be changed by adjusting the position of a moving plate on the auxiliary clamping device.
本发明涉及一种建筑施工给排水管连接固定施工工艺,其主要利用了一种建筑施工安装工程给排水管连接固定支架配合完成,该建筑施工给排水管连接固定施工工艺具体包括以下步骤:S1、安装位置施工:通过现有挖掘机与人工配合方式挖掘出所需管道所需施工空间;S2、管道安放:将准备好的管道横向均匀并列排布安放在施工空间内;S3、管道安装:相邻两个管道之间通过所述建筑施工安装工程给排水管连接固定支架进行固定连接;本发明通过转动收紧装置或者辅助夹紧装置可以适应不同间隔的管道安装,通过调整辅助夹紧装置上移动板的位置可以改变辅助夹紧装置的量程。
Construction process for connecting and fixing water supply and drainage pipe in building construction
一种建筑施工给排水管连接固定施工工艺
CHEN YIFANG (author) / LI HAIBO (author)
2020-06-30
Patent
Electronic Resource
Chinese
European Patent Office | 2021
|European Patent Office | 2020
|Green building water supply and drainage system connecting module and construction method thereof
European Patent Office | 2021
|Building construction water supply and drainage project construction method
European Patent Office | 2023
|Building construction water supply and drainage engineering construction method
European Patent Office | 2020
|