A platform for research: civil engineering, architecture and urbanism
The invention provides a method for manufacturing a pier stud precast piece and a bridge pier. The method for manufacturing the pier stud precast piece comprises the following steps that a reinforcement cage is bound; a positioning formwork is obtained; a bottom formwork is installed; the reinforcement cage is placed in the bottom formwork to complete the closure of a side formwork and an internalformwork; concrete is poured into a formwork cavity and solidified to form a concrete column; and the side formwork is electrically controlled to be moved horizontally to an open state in a reciprocating mode, the internal formwork and the bottom formwork are removed, and the pier stud precast piece is obtained. According to the method for manufacturing the pier stud precast piece of the embodiment of the invention, the construction is convenient, the efficiency is high, the cost is reduced, and the method is economic and environment friendly.
本发明提供了一种墩柱预制件的制造方法及桥墩,墩柱预制件的制造方法包括以下步骤:绑扎钢筋笼;获取定位模具;安装底模;将钢筋笼放置于所述底模,完成侧模和内模闭合;向模腔内浇注混凝土并固化,以形成混凝土柱;电动控制侧模板往复平移至打开状态,拆除内模和底模,得到墩柱预制件。根据本发明实施例的制造方法,施工方便、效率高,且减少成本,经济环保。
The invention provides a method for manufacturing a pier stud precast piece and a bridge pier. The method for manufacturing the pier stud precast piece comprises the following steps that a reinforcement cage is bound; a positioning formwork is obtained; a bottom formwork is installed; the reinforcement cage is placed in the bottom formwork to complete the closure of a side formwork and an internalformwork; concrete is poured into a formwork cavity and solidified to form a concrete column; and the side formwork is electrically controlled to be moved horizontally to an open state in a reciprocating mode, the internal formwork and the bottom formwork are removed, and the pier stud precast piece is obtained. According to the method for manufacturing the pier stud precast piece of the embodiment of the invention, the construction is convenient, the efficiency is high, the cost is reduced, and the method is economic and environment friendly.
本发明提供了一种墩柱预制件的制造方法及桥墩,墩柱预制件的制造方法包括以下步骤:绑扎钢筋笼;获取定位模具;安装底模;将钢筋笼放置于所述底模,完成侧模和内模闭合;向模腔内浇注混凝土并固化,以形成混凝土柱;电动控制侧模板往复平移至打开状态,拆除内模和底模,得到墩柱预制件。根据本发明实施例的制造方法,施工方便、效率高,且减少成本,经济环保。
Method for manufacturing pier stud precast piece and bridge pier
一种墩柱预制件的制造方法及桥墩
2020-07-03
Patent
Electronic Resource
Chinese
Pier stud template positioning device for bridge pier stud construction and using method thereof
European Patent Office | 2021
|Pier stud fair-faced concrete construction method and pier stud
European Patent Office | 2020
|