A platform for research: civil engineering, architecture and urbanism
Pier top hanging fence for pier of high-speed railway bridge
The invention discloses a pier top hanging fence for a pier of a high-speed railway bridge. The pier top hanging fence comprises a triangular support, a base plate and a fence, the triangular supportcomprises a horizontal supporting rod, a fixing rod and a supporting rod, an embedded block is arranged on the side wall of the fixing rod, a steel cable is connected to the embedded block, an anchorpoint is arranged at the other end of the steel cable, the anchor point is arranged in the bridge pier, the triangular support is arranged around the side wall of the bridge pier, the base plate is installed on the horizontal supporting rod, and the fence is fixedly installed at the end of the outer side of the horizontal supporting rod. The triangular support is connected with the bridge pier through the embedded block, so that the connection firmness of the triangular support on the side wall of the bridge pier is high, and the connection strength of the embedded blocks in the bridge pier isfurther improved through the steel cable and the anchor point; and the triangular support is easy to level and fix, so that the levelness of the horizontal supporting rod of the triangular support iskept consistent after the pier is solidified and formed, and later installation of the base plate and the fence is facilitated.
本发明公开了一种用于高速铁路桥桥墩墩顶吊围栏,包括三角支架、垫板和围栏,三角支架包括水平支杆、固定杆和支撑杆,所述固定杆的侧壁上设有预埋块,所述预埋块上连接有钢索,钢索的另一端设有锚点,所述锚点设置在桥墩内,所述三角支架环绕桥墩的侧壁设置,所述垫板安装在水平支杆上,所述围栏固定安装在水平支杆的外侧端部。本发明的三角支架由预埋块实现与桥墩的连接,这样三角支架在桥墩侧壁上的连接牢固性更高,预埋块通过钢索及锚点进一步提高了在桥墩内的连接强度;而且三角支架更容易进行调平及固定,使得桥墩固结成型后三角支架的水平支杆保持水平度一直,更有利于后期垫板和围栏的安装。
Pier top hanging fence for pier of high-speed railway bridge
The invention discloses a pier top hanging fence for a pier of a high-speed railway bridge. The pier top hanging fence comprises a triangular support, a base plate and a fence, the triangular supportcomprises a horizontal supporting rod, a fixing rod and a supporting rod, an embedded block is arranged on the side wall of the fixing rod, a steel cable is connected to the embedded block, an anchorpoint is arranged at the other end of the steel cable, the anchor point is arranged in the bridge pier, the triangular support is arranged around the side wall of the bridge pier, the base plate is installed on the horizontal supporting rod, and the fence is fixedly installed at the end of the outer side of the horizontal supporting rod. The triangular support is connected with the bridge pier through the embedded block, so that the connection firmness of the triangular support on the side wall of the bridge pier is high, and the connection strength of the embedded blocks in the bridge pier isfurther improved through the steel cable and the anchor point; and the triangular support is easy to level and fix, so that the levelness of the horizontal supporting rod of the triangular support iskept consistent after the pier is solidified and formed, and later installation of the base plate and the fence is facilitated.
本发明公开了一种用于高速铁路桥桥墩墩顶吊围栏,包括三角支架、垫板和围栏,三角支架包括水平支杆、固定杆和支撑杆,所述固定杆的侧壁上设有预埋块,所述预埋块上连接有钢索,钢索的另一端设有锚点,所述锚点设置在桥墩内,所述三角支架环绕桥墩的侧壁设置,所述垫板安装在水平支杆上,所述围栏固定安装在水平支杆的外侧端部。本发明的三角支架由预埋块实现与桥墩的连接,这样三角支架在桥墩侧壁上的连接牢固性更高,预埋块通过钢索及锚点进一步提高了在桥墩内的连接强度;而且三角支架更容易进行调平及固定,使得桥墩固结成型后三角支架的水平支杆保持水平度一直,更有利于后期垫板和围栏的安装。
Pier top hanging fence for pier of high-speed railway bridge
一种用于高速铁路桥桥墩墩顶吊围栏
ZHU CHANGSHENG (author) / XU WENJING (author)
2020-07-03
Patent
Electronic Resource
Chinese
Bridge pier hanging fence construction operation platform
European Patent Office | 2023
|Mounting operation platform for hanging fence at top of pier of high-speed railway bridge
European Patent Office | 2023
|Method for fixedly connecting highway bridge pier support overhauling fence and pier
European Patent Office | 2020
|Pier top hanging fence embedded channel double-hole positioning device
European Patent Office | 2023
|