Maintenance method of ballast track bed
The application relates to a maintenance method of a ballast track bed. A railway ballast cementing layer is arranged on the surface layer of a ballast track bed; and the railway ballast cementing layer is obtained by cementing granular railway ballasts laid on the surface layer of the ballast track bed. The maintenance method comprises the following steps: cleaning dust on the railway ballast cementing layer; destroying the structure of the cleaned railway ballast cementing layer, and tampering a ballast track bed; re-paving the granular railway ballast on the surface layer of the tamped ballast track bed; and cementing the relaid granular railway ballast to obtain a new railway ballast cementing layer. Therefore, a local ballast track bed can be maintained, construction is conducted on an operation line through skylight time, and normal operation of a train is not affected; maintenance related tools and materials are simple, maintenance is convenient, and cost is low. Meanwhile, therailway ballast cementing layer can effectively prevent pulverized coal from invading the ballast bed, a problem that the ballast bed is hardened due to pulverized coal invasion is solved, and a largeamount of screening cost is saved; in addition, the ballast bed with the surface layer sealed through cementation still has a good drainage function.
本申请涉及一种有砟道床的维修方法。其中,有砟道床的表层设有道砟胶结层;道砟胶结层为铺设在有砟道床的表层的颗粒道砟经胶结得到。维修方法包括:清理道砟胶结层上的粉尘;破坏清理后的道砟胶结层的结构,捣固有砟道床;在捣固后的有砟道床的表层重新铺设颗粒道砟;对重新铺设的颗粒道砟进行胶结,得到新的道砟胶结层。基于此,可对局部的有砟道床进行维修,利用天窗时间在运营线进行施工,不影响列车正常运营;维修涉及的工具和材料简单,养护维修方便,成本低。同时,道砟胶结层能够有效阻止煤粉侵入道床,解决由煤粉侵入导致的有砟道床板结问题,节约了大量清筛成本;并且,表层通过胶结封闭后的道床仍具有良好的排水功能。
Maintenance method of ballast track bed
The application relates to a maintenance method of a ballast track bed. A railway ballast cementing layer is arranged on the surface layer of a ballast track bed; and the railway ballast cementing layer is obtained by cementing granular railway ballasts laid on the surface layer of the ballast track bed. The maintenance method comprises the following steps: cleaning dust on the railway ballast cementing layer; destroying the structure of the cleaned railway ballast cementing layer, and tampering a ballast track bed; re-paving the granular railway ballast on the surface layer of the tamped ballast track bed; and cementing the relaid granular railway ballast to obtain a new railway ballast cementing layer. Therefore, a local ballast track bed can be maintained, construction is conducted on an operation line through skylight time, and normal operation of a train is not affected; maintenance related tools and materials are simple, maintenance is convenient, and cost is low. Meanwhile, therailway ballast cementing layer can effectively prevent pulverized coal from invading the ballast bed, a problem that the ballast bed is hardened due to pulverized coal invasion is solved, and a largeamount of screening cost is saved; in addition, the ballast bed with the surface layer sealed through cementation still has a good drainage function.
本申请涉及一种有砟道床的维修方法。其中,有砟道床的表层设有道砟胶结层;道砟胶结层为铺设在有砟道床的表层的颗粒道砟经胶结得到。维修方法包括:清理道砟胶结层上的粉尘;破坏清理后的道砟胶结层的结构,捣固有砟道床;在捣固后的有砟道床的表层重新铺设颗粒道砟;对重新铺设的颗粒道砟进行胶结,得到新的道砟胶结层。基于此,可对局部的有砟道床进行维修,利用天窗时间在运营线进行施工,不影响列车正常运营;维修涉及的工具和材料简单,养护维修方便,成本低。同时,道砟胶结层能够有效阻止煤粉侵入道床,解决由煤粉侵入导致的有砟道床板结问题,节约了大量清筛成本;并且,表层通过胶结封闭后的道床仍具有良好的排水功能。
Maintenance method of ballast track bed
有砟道床的维修方法
LUO HUIGANG (author) / DONG YANDONG (author) / LI ZHIYUN (author) / WANG LIJUN (author) / BAI XINRONG (author) / ZHAO HAIJUN (author) / ZHU LI (author)
2020-07-10
Patent
Electronic Resource
Chinese
IPC:
E01B
PERMANENT WAY
,
Gleisoberbau
European Patent Office | 2021
|Method and track maintenance machine for treatment of a ballast track
European Patent Office | 2024
|METHOD AND TRACK MAINTENANCE MACHINE FOR TREATMENT OF A BALLAST TRACK
European Patent Office | 2022
|