A platform for research: civil engineering, architecture and urbanism
SMW construction method pile section steel fixing device and construction method
The invention discloses an SMW construction method pile section steel fixing device and a construction method, and belongs to the technical field of construction method pile construction. The device comprises two guiding beams which are arranged in parallel, a positioning mechanism is arranged between the two guiding beams, the positioning mechanism comprises a first adjusting assembly and a second adjusting assembly, the first adjusting assembly is adjustably arranged between the two guiding beams, the second adjusting assembly is adjustably arranged on the first adjusting assembly, and the position of section steel is fixed through the first adjusting assembly and the second adjusting assembly. According to the device and the method, the first adjusting assembly can slide to any positionon the guiding beams, meanwhile, the distance between the two guiding beams can be guaranteed, and then the second adjusting assembly is combined to enable the section steel to be transversely and longitudinally positioned, and the section steel is kept vertically inserted downwards through the second adjusting assembly in the downward inserting process, so that accurate positioning on the section steel is guaranteed.
本发明公开了一种SMW工法桩型钢固定装置及施工方法,属于工法桩施工的技术领域。包括导向梁,所述导向梁平行设置有两个,两个所述导向梁之间设有定位机构,所述定位机构包括调节组件一和调节组件二,所述调节组件一可调节设置在两个导向梁之间,所述调节组件二可调节设置在调节组件一上,通过所述调节组件一和调节组件二对型钢实现位置固定。利用调节组件一在导向梁上滑动至任一位置,同时还能保证其两个导向梁之间的距离,再结合调节组件二使得型钢进行横向和纵向定位,型钢下插过成中通过调节组件二保持竖直下插,进而保证其精准定位。
SMW construction method pile section steel fixing device and construction method
The invention discloses an SMW construction method pile section steel fixing device and a construction method, and belongs to the technical field of construction method pile construction. The device comprises two guiding beams which are arranged in parallel, a positioning mechanism is arranged between the two guiding beams, the positioning mechanism comprises a first adjusting assembly and a second adjusting assembly, the first adjusting assembly is adjustably arranged between the two guiding beams, the second adjusting assembly is adjustably arranged on the first adjusting assembly, and the position of section steel is fixed through the first adjusting assembly and the second adjusting assembly. According to the device and the method, the first adjusting assembly can slide to any positionon the guiding beams, meanwhile, the distance between the two guiding beams can be guaranteed, and then the second adjusting assembly is combined to enable the section steel to be transversely and longitudinally positioned, and the section steel is kept vertically inserted downwards through the second adjusting assembly in the downward inserting process, so that accurate positioning on the section steel is guaranteed.
本发明公开了一种SMW工法桩型钢固定装置及施工方法,属于工法桩施工的技术领域。包括导向梁,所述导向梁平行设置有两个,两个所述导向梁之间设有定位机构,所述定位机构包括调节组件一和调节组件二,所述调节组件一可调节设置在两个导向梁之间,所述调节组件二可调节设置在调节组件一上,通过所述调节组件一和调节组件二对型钢实现位置固定。利用调节组件一在导向梁上滑动至任一位置,同时还能保证其两个导向梁之间的距离,再结合调节组件二使得型钢进行横向和纵向定位,型钢下插过成中通过调节组件二保持竖直下插,进而保证其精准定位。
SMW construction method pile section steel fixing device and construction method
一种SMW工法桩型钢固定装置及施工方法
LI HUANHUAN (author) / PAN PENGFEI (author) / PAN BANGQUAN (author) / HU SHENGXIA (author) / XU WENTAO (author)
2020-07-10
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Steel pipe pile connecting and fixing device and construction method thereof
European Patent Office | 2020
|European Patent Office | 2018
|