A platform for research: civil engineering, architecture and urbanism
Jacking construction method for cast-in-place concrete structure building and device thereof
The invention discloses a jacking construction method for a cast-in-place concrete structure building and a device thereof. According to the jacking construction method, an unconventional constructionmethod from a roof to a bottom layer is adopted, after a reinforced concrete foundation project is completed, firstly, a roof project is constructed, secondly, a top layer project is constructed, andthirdly, a next layer project of the top layer is constructed until the bottom layer project is completed. According to the construction method, the working face is constructed on the first floor ofthe ground or in a basement all the time, auxiliary tools such as a tower crane, an elevator and a scaffold are not needed, noise and environmental pollution are avoided, and the construction method has the advantages of being time-saving, labor-saving, material-saving, capital-saving and safe.
本发明公开的一种用于现浇混凝土结构建筑物的顶升施工方法及其装置,本发明采用了一种由屋面至底层的反常规施工方法,当钢筋混凝土基础工程完成之后,首先施工屋面工程,其次施工顶层工程,再次施工顶下一层工程,直到完成底层工程,这种施工方法的作业面始终在地面一层或者地下室施工,无须塔吊、电梯、脚手架等辅助工具,也没有噪音、环境污染,具有省时、省工、省料、省资金、安全的优点。
Jacking construction method for cast-in-place concrete structure building and device thereof
The invention discloses a jacking construction method for a cast-in-place concrete structure building and a device thereof. According to the jacking construction method, an unconventional constructionmethod from a roof to a bottom layer is adopted, after a reinforced concrete foundation project is completed, firstly, a roof project is constructed, secondly, a top layer project is constructed, andthirdly, a next layer project of the top layer is constructed until the bottom layer project is completed. According to the construction method, the working face is constructed on the first floor ofthe ground or in a basement all the time, auxiliary tools such as a tower crane, an elevator and a scaffold are not needed, noise and environmental pollution are avoided, and the construction method has the advantages of being time-saving, labor-saving, material-saving, capital-saving and safe.
本发明公开的一种用于现浇混凝土结构建筑物的顶升施工方法及其装置,本发明采用了一种由屋面至底层的反常规施工方法,当钢筋混凝土基础工程完成之后,首先施工屋面工程,其次施工顶层工程,再次施工顶下一层工程,直到完成底层工程,这种施工方法的作业面始终在地面一层或者地下室施工,无须塔吊、电梯、脚手架等辅助工具,也没有噪音、环境污染,具有省时、省工、省料、省资金、安全的优点。
Jacking construction method for cast-in-place concrete structure building and device thereof
一种用于现浇混凝土结构建筑物的顶升施工方法及其装置
GAO JILIANG (author) / GAO BO (author) / GAO RENHUA (author) / GENG MANNING (author) / LIU YUN (author) / YIN XIANG (author) / LI TIANYAO (author) / CHEN AOBO (author)
2020-07-10
Patent
Electronic Resource
Chinese
Cast-in-place box culvert jacking structure and construction method
European Patent Office | 2020
|Steel die cast-in-place type pipe jacking section and construction method thereof
European Patent Office | 2022
|Building structure reverse jacking reinforcing device and construction method thereof
European Patent Office | 2024
|Pipe-jacking building wall structure and construction method thereof
European Patent Office | 2020
|