A platform for research: civil engineering, architecture and urbanism
Adjustable bracket and installation method of horizontal pre-buried pipeline
The invention relates to the technical field of building construction, in particular to an adjustable bracket and an installation method of a horizontal pre-buried pipeline. The adjustable bracket iscomposed of a pipeline bracket, an adjustable brace and a pipeline hoop, the pipeline bracket is provided with two steel plates horizontally arranged up and down, and bolt holes are formed in the twosteel plates. The adjustable brace comprises a screw, a nut and a U-shaped supporting plate, the U-shaped supporting plate is welded to the top of the screw to install the horizontal pre-buried pipeline, the screw is arranged on the two steel plates in a penetrating mode through the bolt holes, and the nuts are arranged on the screw in a spinning mode and located between the two steel plates. Whenthe horizontal pre-buried pipeline is installed, the height of the U-shaped supporting plate can be adjusted by rotating the nuts, so that the installation precision of the horizontal pre-buried pipeline is improved, the installation method is simple and convenient to operate and the construction is fast, and the installation method is suitable for the installation construction of the horizontalpre-buried pipeline in various structures.
本发明涉及建筑施工技术领域,尤其涉及一种可调式支架及水平预埋管道的安装方法,通过设置该可调式支架由管道支架、可调托撑和管道套箍组成,并设置该管道支架具有上下水平设置的两块钢板,该两块钢板上均设置有螺栓孔,且设置该可调托撑包括螺杆、螺母和U形支托板,该U形支托板焊接在该螺杆的顶部以用于安装水平预埋管道,该螺杆通过螺栓孔穿设在两块钢板上,且该螺母旋设在该螺杆上并位于两块钢板之间;在安装水平预埋管道时,可以通过旋转螺母来调整该U形支托板的高度,从而提高了预埋水平管道的安装精度,且该安装方法操作简便、施工快捷,适用于各种结构内预埋水平管道的安装施工。
Adjustable bracket and installation method of horizontal pre-buried pipeline
The invention relates to the technical field of building construction, in particular to an adjustable bracket and an installation method of a horizontal pre-buried pipeline. The adjustable bracket iscomposed of a pipeline bracket, an adjustable brace and a pipeline hoop, the pipeline bracket is provided with two steel plates horizontally arranged up and down, and bolt holes are formed in the twosteel plates. The adjustable brace comprises a screw, a nut and a U-shaped supporting plate, the U-shaped supporting plate is welded to the top of the screw to install the horizontal pre-buried pipeline, the screw is arranged on the two steel plates in a penetrating mode through the bolt holes, and the nuts are arranged on the screw in a spinning mode and located between the two steel plates. Whenthe horizontal pre-buried pipeline is installed, the height of the U-shaped supporting plate can be adjusted by rotating the nuts, so that the installation precision of the horizontal pre-buried pipeline is improved, the installation method is simple and convenient to operate and the construction is fast, and the installation method is suitable for the installation construction of the horizontalpre-buried pipeline in various structures.
本发明涉及建筑施工技术领域,尤其涉及一种可调式支架及水平预埋管道的安装方法,通过设置该可调式支架由管道支架、可调托撑和管道套箍组成,并设置该管道支架具有上下水平设置的两块钢板,该两块钢板上均设置有螺栓孔,且设置该可调托撑包括螺杆、螺母和U形支托板,该U形支托板焊接在该螺杆的顶部以用于安装水平预埋管道,该螺杆通过螺栓孔穿设在两块钢板上,且该螺母旋设在该螺杆上并位于两块钢板之间;在安装水平预埋管道时,可以通过旋转螺母来调整该U形支托板的高度,从而提高了预埋水平管道的安装精度,且该安装方法操作简便、施工快捷,适用于各种结构内预埋水平管道的安装施工。
Adjustable bracket and installation method of horizontal pre-buried pipeline
可调式支架及水平预埋管道的安装方法
ZHAO WANDE (author)
2020-07-10
Patent
Electronic Resource
Chinese
BRACKET SYSTEM AND METHOD FOR INSTALLATION OF HORIZONTAL BALUSTERS
European Patent Office | 2020
|BRACKET SYSTEM AND METHOD FOR INSTALLATION OF HORIZONTAL BALUSTERS
European Patent Office | 2020
|BRACKET SYSTEM AND METHOD FOR INSTALLATION OF HORIZONTAL BALUSTERS
European Patent Office | 2023
|