A platform for research: civil engineering, architecture and urbanism
Bridge construction method and bridge construction equipment
The invention relates to the field of bridge construction and particularly relates to a bridge construction method and bridge construction equipment. The method comprises the following steps that 1, an adjusting worm is made to rotate to enable four moving wheels to rotate to be in contact with the ground, namely pushing a device, and the adjusting worm are made to reversely rotate and move, and the four moving wheels are retracted; 2, two control bolts are rotated so that four fixing nails slide out of supporting leg plates and penetrate into the ground, and a device is fixed; 3, the rotatingworm is rotated, a transmission circular pipe rotates to enable a jacking plate to correspond to a bridge supporting part, then a transmission motor is started to enable a threaded rod to ascend in athreaded pipe, and the jacking plate jacks the bridge supporting part through soft rubber to be matched with bridge construction; and 4, when the bridge supporting part has a certain angle, the jacking plate performs inclined supporting along with an inclination angle of the supporting part, when the jacking plate is retracted, an extruded jacking spring pushes jacking wheels to move upwards to drive a matching plate, so the jacking plate is kept in a horizontal state for next use.
本发明涉及桥梁修建领域,特别是涉及一种桥梁修建方法与桥梁修建设备,该方法为:1、转动移动调节蜗杆,使四个移动轮转动至与地面接触,即可推动装置,反向转动移动调节蜗杆,将四个移动轮收起;2、转动两个控制螺栓,使四个固定钉从支撑腿板滑出扎入地面,将装置固定;3、转动旋转蜗杆,传动圆管转动,使顶紧板与桥梁支撑部分相对应,然后启动传动电机,使螺纹杆在螺纹管内上升,使顶紧板通过软质橡胶顶紧桥梁支撑部分,配合桥梁修建;4、当桥梁支撑部分具有一定角度时,顶紧板随支撑部分的倾斜角度进行倾斜支撑,在收回时,受挤压的顶紧弹簧弹力推动顶紧轮上移,传动配合板,使顶紧板保持水平状态,以便下次使用。
Bridge construction method and bridge construction equipment
The invention relates to the field of bridge construction and particularly relates to a bridge construction method and bridge construction equipment. The method comprises the following steps that 1, an adjusting worm is made to rotate to enable four moving wheels to rotate to be in contact with the ground, namely pushing a device, and the adjusting worm are made to reversely rotate and move, and the four moving wheels are retracted; 2, two control bolts are rotated so that four fixing nails slide out of supporting leg plates and penetrate into the ground, and a device is fixed; 3, the rotatingworm is rotated, a transmission circular pipe rotates to enable a jacking plate to correspond to a bridge supporting part, then a transmission motor is started to enable a threaded rod to ascend in athreaded pipe, and the jacking plate jacks the bridge supporting part through soft rubber to be matched with bridge construction; and 4, when the bridge supporting part has a certain angle, the jacking plate performs inclined supporting along with an inclination angle of the supporting part, when the jacking plate is retracted, an extruded jacking spring pushes jacking wheels to move upwards to drive a matching plate, so the jacking plate is kept in a horizontal state for next use.
本发明涉及桥梁修建领域,特别是涉及一种桥梁修建方法与桥梁修建设备,该方法为:1、转动移动调节蜗杆,使四个移动轮转动至与地面接触,即可推动装置,反向转动移动调节蜗杆,将四个移动轮收起;2、转动两个控制螺栓,使四个固定钉从支撑腿板滑出扎入地面,将装置固定;3、转动旋转蜗杆,传动圆管转动,使顶紧板与桥梁支撑部分相对应,然后启动传动电机,使螺纹杆在螺纹管内上升,使顶紧板通过软质橡胶顶紧桥梁支撑部分,配合桥梁修建;4、当桥梁支撑部分具有一定角度时,顶紧板随支撑部分的倾斜角度进行倾斜支撑,在收回时,受挤压的顶紧弹簧弹力推动顶紧轮上移,传动配合板,使顶紧板保持水平状态,以便下次使用。
Bridge construction method and bridge construction equipment
一种桥梁修建方法与桥梁修建设备
LIU CHANGDONG (author)
2020-07-14
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
Online Contents | 2014
|TIBKAT | 2013
|Bridge abutment construction method, bridge pier construction method and bridge construction method
European Patent Office | 2023
|Bridge pier construction equipment and construction method
European Patent Office | 2023
|European Patent Office | 2024
|