Concrete warehousing pouring construction equipment and method
The invention provides concrete warehousing pouring construction equipment and method. A main winch of the construction equipment is connected with a vibration hopper lifting lug, an auxiliary winch is connected with a guide pipe valve, a clamp-on vibrator is mounted in a vibration hopper, a vibration hopper valve is connected with the lower end of the vibration hopper and connected with a guide pipe, the guide pipe is connected with the guide pipe valve, a concrete pump truck is connected with a concrete delivery pipe through a braided rubber tube, and an outlet end of the concrete delivery pipe is in butted joint with the vibration hopper. The construction method comprises steps as follows: (1), performing preparation of pre-construction; (2), enabling the equipment to be in place; (3),feeding the vibration hopper by the concrete pump truck; (4), pouring the concrete; (5), moving and adjusting positions of the vibration hopper and the guide pipe to finish concrete pouring. In the concrete pouring construction process of marine traffic engineering buildings, the problems of backward flowing and pipe blocking can be solved, the poured concrete quality is high, the construction efficiency is high, and environmental pollution is reduced.
一种混凝土入仓浇筑施工设备及其施工方法,该施工设备的主卷扬机与振动料斗吊耳连接,副卷扬机与导管阀门连接,振动料斗中安装有附着式振动器,振动料斗的下端连接有振动料斗阀门,振动料斗阀门与导管连接,导管与导管阀门连接,混凝土泵车通过编织橡胶管与混凝土输料管连接,混凝土输料管的出口端与振动料斗对接。该施工方法包括:(1)施工前期准备;(2)设备就位;(3)混凝土泵车给振动料斗上料;(4)浇筑混凝土;(5)移动和调整振动料斗和导管位置完成混凝土浇筑。本发明在水运工程建筑物混凝土浇筑施工过程中,不会发生水流倒灌、堵管的问题,浇筑的混凝土质量好,施工效率高、减少环境污染。
Concrete warehousing pouring construction equipment and method
The invention provides concrete warehousing pouring construction equipment and method. A main winch of the construction equipment is connected with a vibration hopper lifting lug, an auxiliary winch is connected with a guide pipe valve, a clamp-on vibrator is mounted in a vibration hopper, a vibration hopper valve is connected with the lower end of the vibration hopper and connected with a guide pipe, the guide pipe is connected with the guide pipe valve, a concrete pump truck is connected with a concrete delivery pipe through a braided rubber tube, and an outlet end of the concrete delivery pipe is in butted joint with the vibration hopper. The construction method comprises steps as follows: (1), performing preparation of pre-construction; (2), enabling the equipment to be in place; (3),feeding the vibration hopper by the concrete pump truck; (4), pouring the concrete; (5), moving and adjusting positions of the vibration hopper and the guide pipe to finish concrete pouring. In the concrete pouring construction process of marine traffic engineering buildings, the problems of backward flowing and pipe blocking can be solved, the poured concrete quality is high, the construction efficiency is high, and environmental pollution is reduced.
一种混凝土入仓浇筑施工设备及其施工方法,该施工设备的主卷扬机与振动料斗吊耳连接,副卷扬机与导管阀门连接,振动料斗中安装有附着式振动器,振动料斗的下端连接有振动料斗阀门,振动料斗阀门与导管连接,导管与导管阀门连接,混凝土泵车通过编织橡胶管与混凝土输料管连接,混凝土输料管的出口端与振动料斗对接。该施工方法包括:(1)施工前期准备;(2)设备就位;(3)混凝土泵车给振动料斗上料;(4)浇筑混凝土;(5)移动和调整振动料斗和导管位置完成混凝土浇筑。本发明在水运工程建筑物混凝土浇筑施工过程中,不会发生水流倒灌、堵管的问题,浇筑的混凝土质量好,施工效率高、减少环境污染。
Concrete warehousing pouring construction equipment and method
一种混凝土入仓浇筑施工设备及其施工方法
LU SHAOFENG (author) / MENG PINGPING (author) / TU JUNXING (author) / LU FEIMING (author) / MU QIZHANG (author) / YUAN MING (author) / LI HUA (author) / WEI ZHUOJUN (author) / HUANG KAI (author) / JIA DONGMEI (author)
2020-07-17
Patent
Electronic Resource
Chinese