A platform for research: civil engineering, architecture and urbanism
Dry hanging stone curtain wall installation and construction method
The invention relates to a dry hanging stone curtain wall installation and construction method. A dry hanging stone curtain wall installation and construction device comprises a positioning device, atelescopic bracket and a supporting device, wherein the telescopic bracket is fixedly installed on the upper end of the positioning device, and the supporting device is fixedly installed on the upperend of the telescopic bracket; and the supporting device comprises a supporting plate, an first electric push rod, a first supporting frame, a second electric push rod, a second supporting frame and athird supporting frame. According to the dry hanging stone curtain wall installation and construction method, the movement and fixation of the device are controlled by the positioning device, the supporting device is enabled to be aligned with the left side and the lower end of a first dimension stone through the matching of the positioning device and the telescopic bracket, after the first column of dimension stones is aligned, supported and fixed by the supporting device, the first line of the dimension stones is supported and fixed again, and finally all the dimension stones are supportedand fixed; and thus manual work content is reduced, and installation efficiency and installation quality are improved at the same time.
本发明涉及一种干挂石材幕墙安装施工方法,包括定位装置、可伸缩支架与支撑装置,定位装置上端固定安装有可伸缩支架,可伸缩支架上端固定安装有支撑装置,所述支撑装置包括支撑板、电动推杆一、支撑架一、电动推杆二、支撑架二与支撑架三,本发明通过定位装置控制设备的运动与固定,通过定位装置与可伸缩支架相配合使支撑装置与第一块石材左侧以及下端均对齐,通过支撑装置对石材第一列进行对齐支撑固定后,再次对第一行进行支撑固定,最终对所有石材进行支撑固定,从而减少人工的工作内容,同时提高安装效率以及安装质量。
Dry hanging stone curtain wall installation and construction method
The invention relates to a dry hanging stone curtain wall installation and construction method. A dry hanging stone curtain wall installation and construction device comprises a positioning device, atelescopic bracket and a supporting device, wherein the telescopic bracket is fixedly installed on the upper end of the positioning device, and the supporting device is fixedly installed on the upperend of the telescopic bracket; and the supporting device comprises a supporting plate, an first electric push rod, a first supporting frame, a second electric push rod, a second supporting frame and athird supporting frame. According to the dry hanging stone curtain wall installation and construction method, the movement and fixation of the device are controlled by the positioning device, the supporting device is enabled to be aligned with the left side and the lower end of a first dimension stone through the matching of the positioning device and the telescopic bracket, after the first column of dimension stones is aligned, supported and fixed by the supporting device, the first line of the dimension stones is supported and fixed again, and finally all the dimension stones are supportedand fixed; and thus manual work content is reduced, and installation efficiency and installation quality are improved at the same time.
本发明涉及一种干挂石材幕墙安装施工方法,包括定位装置、可伸缩支架与支撑装置,定位装置上端固定安装有可伸缩支架,可伸缩支架上端固定安装有支撑装置,所述支撑装置包括支撑板、电动推杆一、支撑架一、电动推杆二、支撑架二与支撑架三,本发明通过定位装置控制设备的运动与固定,通过定位装置与可伸缩支架相配合使支撑装置与第一块石材左侧以及下端均对齐,通过支撑装置对石材第一列进行对齐支撑固定后,再次对第一行进行支撑固定,最终对所有石材进行支撑固定,从而减少人工的工作内容,同时提高安装效率以及安装质量。
Dry hanging stone curtain wall installation and construction method
一种干挂石材幕墙安装施工方法
ZHU KEJI (author) / CHEN LIQUN (author) / CHEN WANG (author)
2020-07-28
Patent
Electronic Resource
Chinese
Installation construction method for building dry hanging stone curtain wall
European Patent Office | 2021
|Dry hanging stone curtain wall and installation method thereof
European Patent Office | 2022
|Dry hanging stone curtain wall construction method and curtain wall structure
European Patent Office | 2024
|Curtain wall construction method adopting stone dry hanging
European Patent Office | 2021
|