A platform for research: civil engineering, architecture and urbanism
Empty drum prevention accurate leveling floor construction method
The invention relates to an empty drum prevention accurate leveling floor construction method. The empty drum prevention accurate leveling floor construction method comprises the following steps of S1, cleaning a base layer; S2, laying a plurality of leveling assemblies, wherein workers place the plurality of leveling assemblies on the base layer, float block pieces are slidably arranged on the leveling assemblies in the vertical direction and are suspended above the base layer, and the upper surfaces and the lower surfaces of the float block pieces are arranged horizontally; S3, pouring self-leveling mortar; S4, laying a cement mortar layer, wherein the workers lay the cement mortar layer after the self-leveling mortar is dry in the shade, and the cement mortar layer and the upper surfaces of the float block pieces are located at the same horizontal height; and S5, laying a floor. The empty drum prevention accurate leveling floor construction method has the effects that the workers can accurately level the cement mortar layer; the self-leveling mortar supports the float block pieces, so that the float block pieces are not likely to sink when the upper surfaces of the float block pieces bear force; and the phenomena of cracks or empty drums caused by local water shortage are not likely to occur to the cement mortar.
本发明涉及一种防空鼓精找平地板施工方法,其包括以下步骤S1、基层清理,S2、铺设找平组件:工作人员在基层上放置若干找平组件,找平组件上沿竖直方向滑动设置有浮块件,浮块件悬空放置于基层上方,浮块件的上表面与下表面水平设置;S3、浇注自流平砂浆:S4、铺设水泥砂浆层:待自流平砂浆阴干后,工作人员铺设水泥砂浆层,水泥砂浆层与浮块件的上表面处于同一水平高度;S5、地板铺贴。本发明具有有利于工作人员对水泥砂浆层进行精找平,自流平砂浆支撑浮块件,使浮块件的上表面受力时,不易下陷的效果,水泥砂浆不易因为局部缺水后发生裂痕或空鼓现象的效果。
Empty drum prevention accurate leveling floor construction method
The invention relates to an empty drum prevention accurate leveling floor construction method. The empty drum prevention accurate leveling floor construction method comprises the following steps of S1, cleaning a base layer; S2, laying a plurality of leveling assemblies, wherein workers place the plurality of leveling assemblies on the base layer, float block pieces are slidably arranged on the leveling assemblies in the vertical direction and are suspended above the base layer, and the upper surfaces and the lower surfaces of the float block pieces are arranged horizontally; S3, pouring self-leveling mortar; S4, laying a cement mortar layer, wherein the workers lay the cement mortar layer after the self-leveling mortar is dry in the shade, and the cement mortar layer and the upper surfaces of the float block pieces are located at the same horizontal height; and S5, laying a floor. The empty drum prevention accurate leveling floor construction method has the effects that the workers can accurately level the cement mortar layer; the self-leveling mortar supports the float block pieces, so that the float block pieces are not likely to sink when the upper surfaces of the float block pieces bear force; and the phenomena of cracks or empty drums caused by local water shortage are not likely to occur to the cement mortar.
本发明涉及一种防空鼓精找平地板施工方法,其包括以下步骤S1、基层清理,S2、铺设找平组件:工作人员在基层上放置若干找平组件,找平组件上沿竖直方向滑动设置有浮块件,浮块件悬空放置于基层上方,浮块件的上表面与下表面水平设置;S3、浇注自流平砂浆:S4、铺设水泥砂浆层:待自流平砂浆阴干后,工作人员铺设水泥砂浆层,水泥砂浆层与浮块件的上表面处于同一水平高度;S5、地板铺贴。本发明具有有利于工作人员对水泥砂浆层进行精找平,自流平砂浆支撑浮块件,使浮块件的上表面受力时,不易下陷的效果,水泥砂浆不易因为局部缺水后发生裂痕或空鼓现象的效果。
Empty drum prevention accurate leveling floor construction method
防空鼓精找平地板施工方法
ZOU KEQIN (author) / LIU SHUREN (author) / CHEN XIAOBIN (author) / ZHOU LAN (author) / LI WEIMING (author) / ZHONG MAOWEN (author) / ZOU XIAOXIONG (author) / LI HAOXIANG (author) / YANG WENYI (author) / GAO YANGQING (author)
2020-07-31
Patent
Electronic Resource
Chinese
IPC:
E04F
FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
,
Ausbau von Bauwerken, z.B. Treppen, Fußböden
Building prefabricated construction floor leveling device
European Patent Office | 2020
|Concrete leveling floor crack repairing construction method
European Patent Office | 2024
|