A platform for research: civil engineering, architecture and urbanism
Steel bar grouting process for assembly type prefabricated wallboard of high-rise building
The invention relates to the field of prefabricated wallboard assembly, and discloses a steel bar grouting process for an assembly type prefabricated wallboard of a high-rise building. The steel bar grouting process comprises the following devices which are a grouting pump, a mortar mixer, an electronic weighing scale, a measuring cup, an iron bucket, a screen and a rubber hole plugging plug; andthe process flow of the steel bar grouting process for the assembly type prefabricated wallboard of the high-rise building comprises the following steps of S1, base treatment of the prefabricated wallboard before grouting; S2, joint sealing for seat slurry and bin dividing treatment; S3, preparation of grout; S4, grouting material inspection; S5, construction preparation before grouting work; andS6, grouting. According to the steel bar grouting process for the assembly type prefabricated wallboard of the high-rise building, partition treatment is carried out on grouting, grouting is carried out from one side, it is ensured that air can be exhausted during grouting, it is avoided that air is caught during simultaneous grouting on the two sides, an air interlayer is formed in a grouted wallboard, and therefore the grouting quality is improved.
本发明涉及预制墙板装配领域,且公开了一种高层建筑装配式预制墙板钢筋灌浆工艺,所述高层建筑装配式预制墙板钢筋灌浆工艺,包括如下设备:灌浆泵、砂浆搅拌机、电子秤量称、量杯、铁桶、筛网、橡胶堵孔塞;所述高层建筑装配式预制墙板钢筋灌浆工艺的工艺流程如下:S1、灌浆前预制墙板的基层处理;S2、座浆料封缝、分仓处理;S3、灌浆的制备;S4、灌浆料检验;S5、灌浆工作前的施工准备;S6、灌浆。该高层建筑装配式预制墙板钢筋灌浆工艺,通过对灌浆进行分区处理,从一侧灌浆,确保灌浆时能够排除空气,防止两侧以上同时灌浆窝住空气,在灌浆墙板内形成空气夹层,从而提高了灌浆的质。
Steel bar grouting process for assembly type prefabricated wallboard of high-rise building
The invention relates to the field of prefabricated wallboard assembly, and discloses a steel bar grouting process for an assembly type prefabricated wallboard of a high-rise building. The steel bar grouting process comprises the following devices which are a grouting pump, a mortar mixer, an electronic weighing scale, a measuring cup, an iron bucket, a screen and a rubber hole plugging plug; andthe process flow of the steel bar grouting process for the assembly type prefabricated wallboard of the high-rise building comprises the following steps of S1, base treatment of the prefabricated wallboard before grouting; S2, joint sealing for seat slurry and bin dividing treatment; S3, preparation of grout; S4, grouting material inspection; S5, construction preparation before grouting work; andS6, grouting. According to the steel bar grouting process for the assembly type prefabricated wallboard of the high-rise building, partition treatment is carried out on grouting, grouting is carried out from one side, it is ensured that air can be exhausted during grouting, it is avoided that air is caught during simultaneous grouting on the two sides, an air interlayer is formed in a grouted wallboard, and therefore the grouting quality is improved.
本发明涉及预制墙板装配领域,且公开了一种高层建筑装配式预制墙板钢筋灌浆工艺,所述高层建筑装配式预制墙板钢筋灌浆工艺,包括如下设备:灌浆泵、砂浆搅拌机、电子秤量称、量杯、铁桶、筛网、橡胶堵孔塞;所述高层建筑装配式预制墙板钢筋灌浆工艺的工艺流程如下:S1、灌浆前预制墙板的基层处理;S2、座浆料封缝、分仓处理;S3、灌浆的制备;S4、灌浆料检验;S5、灌浆工作前的施工准备;S6、灌浆。该高层建筑装配式预制墙板钢筋灌浆工艺,通过对灌浆进行分区处理,从一侧灌浆,确保灌浆时能够排除空气,防止两侧以上同时灌浆窝住空气,在灌浆墙板内形成空气夹层,从而提高了灌浆的质。
Steel bar grouting process for assembly type prefabricated wallboard of high-rise building
一种高层建筑装配式预制墙板钢筋灌浆工艺
PAN WEI (author) / WAN SHOUFANG (author) / DING JUANJUAN (author) / SHI YUNJI (author) / CAO HAIYAN (author)
2020-07-31
Patent
Electronic Resource
Chinese
Assembling type prefabricated assembly building wallboard
European Patent Office | 2023
|Splicing prefabricated wallboard for assembly type building
European Patent Office | 2022
|European Patent Office | 2021
|Assembly type prefabricated wallboard and prefabricated beam
European Patent Office | 2021
|