A platform for research: civil engineering, architecture and urbanism
Mounting method of steel wire rope hanging ring of cantilever unloading steel platform
The invention discloses a mounting method of a steel wire rope hanging ring of a cantilever unloading steel platform. The mounting method comprises the following steps of: embedding a PVC (polyvinyl chloride) sleeve piece in a beam in advance before concrete pouring of the cantilever unloading steel platform, wherein the PVC sleeve piece is U-shaped; when the strength of the concrete meets the requirement, removing a beam template; then sleeving the PVC sleeve piece with a U-shaped hanging ring, wherein the upper part of the U-shaped hanging ring is provided with a thread; after the PVC sleevepiece penetrates through the PVC sleeve piece, sleeving the U-shaped hanging ring with a thread side with a steel plate with a screw hole; and finally, screwing a nut into the U-shaped hanging ring.
本发明公开了一种悬挑卸料钢平台钢丝绳吊环的安装方法,在悬挑卸料钢平台混凝土浇筑前预先在梁中埋置PVC套管件,所述PVC套管件为U型,待混凝土强度满足要求时,拆除梁模板,然后在PVC套管件内套入U型吊环,所述U型吊环上部带有螺纹,所述穿过PVC套管件后,在U型吊环有螺纹一侧U型吊环上套入带有螺洞的钢板,最后在U型吊环上拧入螺母。
Mounting method of steel wire rope hanging ring of cantilever unloading steel platform
The invention discloses a mounting method of a steel wire rope hanging ring of a cantilever unloading steel platform. The mounting method comprises the following steps of: embedding a PVC (polyvinyl chloride) sleeve piece in a beam in advance before concrete pouring of the cantilever unloading steel platform, wherein the PVC sleeve piece is U-shaped; when the strength of the concrete meets the requirement, removing a beam template; then sleeving the PVC sleeve piece with a U-shaped hanging ring, wherein the upper part of the U-shaped hanging ring is provided with a thread; after the PVC sleevepiece penetrates through the PVC sleeve piece, sleeving the U-shaped hanging ring with a thread side with a steel plate with a screw hole; and finally, screwing a nut into the U-shaped hanging ring.
本发明公开了一种悬挑卸料钢平台钢丝绳吊环的安装方法,在悬挑卸料钢平台混凝土浇筑前预先在梁中埋置PVC套管件,所述PVC套管件为U型,待混凝土强度满足要求时,拆除梁模板,然后在PVC套管件内套入U型吊环,所述U型吊环上部带有螺纹,所述穿过PVC套管件后,在U型吊环有螺纹一侧U型吊环上套入带有螺洞的钢板,最后在U型吊环上拧入螺母。
Mounting method of steel wire rope hanging ring of cantilever unloading steel platform
一种悬挑卸料钢平台钢丝绳吊环的安装方法
DAI PENGPENG (author)
2020-07-31
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
European Patent Office | 2023
|Fixing device and fixing method for unloading steel wire rope on cantilever I-shaped steel
European Patent Office | 2024
|Steel wire rope net platform for construction and mounting method thereof
European Patent Office | 2021
|