A platform for research: civil engineering, architecture and urbanism
Pile-holding guiding pipe rack and construction method thereof
The invention discloses a pile-holding guiding pipe rack and a construction method of the pile-holding guiding pipe rack. The pile-holding guiding pipe rack comprises a guiding pipe rack main body anda pile-holding device connected to the guiding pipe rack main body. The pile-holding guiding pipe rack further comprises an auxiliary pile in sliding fit with the guiding pipe rack main body and a guiding pipe rack leveling device connected between the auxiliary pile and the guiding pipe rack main body. The guiding pipe rack leveling device comprises a ring beam, a bolt assembly connected to thering beam, and a second oil cylinder for driving the ring beam to ascend and descend. The auxiliary pile is inserted into the ring beam, and the bolt assembly can be connected with the ring beam and the auxiliary pile. Before piling, the bolt assembly can be used to connect the ring beam and the auxiliary pile, and then the relative positions of the guide frame main body and the auxiliary pile areadjusted through the second oil cylinder, so that the levelness of the guiding pipe frame main body is adjusted, and the position precision and the perpendicularity of a foundation pile are ensured during later piling.
本发明揭示了一种抱桩导管架及其施工方法,该抱桩导管架包括导管架主体和连接在导管架主体上的抱桩装置,所述抱桩导管架还包括与所述导管架主体滑动配接的辅助桩以及连接在所述辅助桩和所述导管架主体之间的导管架调平装置,所述导管架调平装置包括环梁、连接在所述环梁上的插销组件以及驱动环梁升降的第二油缸,所述辅助桩插设于所述环梁内,所述插销组件可连接所述环梁和所述辅助桩。在打桩前,可先使用插销组件连接环梁和辅助桩,然后通过第二油缸调整导管架主体和辅助桩的相对位置,从而调整导管架主体的水平度,有利于后期打桩时保证基础桩的位置精度和垂直度。
Pile-holding guiding pipe rack and construction method thereof
The invention discloses a pile-holding guiding pipe rack and a construction method of the pile-holding guiding pipe rack. The pile-holding guiding pipe rack comprises a guiding pipe rack main body anda pile-holding device connected to the guiding pipe rack main body. The pile-holding guiding pipe rack further comprises an auxiliary pile in sliding fit with the guiding pipe rack main body and a guiding pipe rack leveling device connected between the auxiliary pile and the guiding pipe rack main body. The guiding pipe rack leveling device comprises a ring beam, a bolt assembly connected to thering beam, and a second oil cylinder for driving the ring beam to ascend and descend. The auxiliary pile is inserted into the ring beam, and the bolt assembly can be connected with the ring beam and the auxiliary pile. Before piling, the bolt assembly can be used to connect the ring beam and the auxiliary pile, and then the relative positions of the guide frame main body and the auxiliary pile areadjusted through the second oil cylinder, so that the levelness of the guiding pipe frame main body is adjusted, and the position precision and the perpendicularity of a foundation pile are ensured during later piling.
本发明揭示了一种抱桩导管架及其施工方法,该抱桩导管架包括导管架主体和连接在导管架主体上的抱桩装置,所述抱桩导管架还包括与所述导管架主体滑动配接的辅助桩以及连接在所述辅助桩和所述导管架主体之间的导管架调平装置,所述导管架调平装置包括环梁、连接在所述环梁上的插销组件以及驱动环梁升降的第二油缸,所述辅助桩插设于所述环梁内,所述插销组件可连接所述环梁和所述辅助桩。在打桩前,可先使用插销组件连接环梁和辅助桩,然后通过第二油缸调整导管架主体和辅助桩的相对位置,从而调整导管架主体的水平度,有利于后期打桩时保证基础桩的位置精度和垂直度。
Pile-holding guiding pipe rack and construction method thereof
一种抱桩导管架及其施工方法
ZHOU FENG (author) / DU HAONAN (author) / LU JIANQING (author) / CHEN XIAOFEI (author)
2020-08-07
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Rock-socketed steel pipe pile construction guiding device
European Patent Office | 2024
|PILE HOLDING JIG, PILE HOLDING JIG ASSEMBLY, AND CONSTRUCTION METHOD FOR HOLDING PILE POSITION
European Patent Office | 2020
|European Patent Office | 2023
|