A platform for research: civil engineering, architecture and urbanism
Vertical post-cast strip plugging measure
The invention discloses a vertical post-cast strip plugging measure. The vertical post-cast strip plugging measure comprises a wall body, wherein split bolts are symmetrically arranged in the wall body in a penetrating mode; fixing blocks are symmetrically arranged in the split bolts in a sleeved mode; the fixing blocks are integrally formed and symmetrically connected to the two ends of a connecting rod; extrusion plates are integrally formed on and symmetrically connected to the connecting rod; grooves are formed in the extrusion plates; sliding grooves are formed in the bottom end surfacesof the grooves at equal intervals; sliding blocks are arranged in the sliding grooves in a sliding connection mode; a first extrusion spring is integrally formed on and connected with one end of eachsliding block, and the other one of each first extrusion spring is integrally formed on one side of the corresponding extrusion block. According to the vertical post-cast strip plugging measure, whenpost-cast strip plugging is carried out, the wall body can be well fixed and supported, the supporting and fixing stability is improved, the post-cast strip plugging work can be carried out conveniently, the plugging success rate is improved, the construction quality is guaranteed, and the appearance quality of a concrete wall is improved.
本发明公开了一种竖向后浇带封堵措施,包括墙体,所述墙体中对称贯穿设置有对拉螺栓,所述对拉螺栓中对称套接设置有固定块,所述固定块一体成型对称连接设置在连接杆的两端、连接杆上一体成型对称连接设置有挤压板,所述挤压板中设置有凹槽,所述凹槽的底端面等距设置有滑槽、滑槽中滑动连接设置有滑块,所述滑块的一端一体成型连接设置有第一挤压弹簧、第一挤压弹簧的另一端一体成型设置在挤压块的一侧,通过本发明对于在进行后浇带封堵时,能够墙体进行很好的固定支撑,提高支撑固定稳固性,便于后浇带封堵工作的进行,提高封堵成功率,保证施工质量,提升混凝土墙的观感质量。
Vertical post-cast strip plugging measure
The invention discloses a vertical post-cast strip plugging measure. The vertical post-cast strip plugging measure comprises a wall body, wherein split bolts are symmetrically arranged in the wall body in a penetrating mode; fixing blocks are symmetrically arranged in the split bolts in a sleeved mode; the fixing blocks are integrally formed and symmetrically connected to the two ends of a connecting rod; extrusion plates are integrally formed on and symmetrically connected to the connecting rod; grooves are formed in the extrusion plates; sliding grooves are formed in the bottom end surfacesof the grooves at equal intervals; sliding blocks are arranged in the sliding grooves in a sliding connection mode; a first extrusion spring is integrally formed on and connected with one end of eachsliding block, and the other one of each first extrusion spring is integrally formed on one side of the corresponding extrusion block. According to the vertical post-cast strip plugging measure, whenpost-cast strip plugging is carried out, the wall body can be well fixed and supported, the supporting and fixing stability is improved, the post-cast strip plugging work can be carried out conveniently, the plugging success rate is improved, the construction quality is guaranteed, and the appearance quality of a concrete wall is improved.
本发明公开了一种竖向后浇带封堵措施,包括墙体,所述墙体中对称贯穿设置有对拉螺栓,所述对拉螺栓中对称套接设置有固定块,所述固定块一体成型对称连接设置在连接杆的两端、连接杆上一体成型对称连接设置有挤压板,所述挤压板中设置有凹槽,所述凹槽的底端面等距设置有滑槽、滑槽中滑动连接设置有滑块,所述滑块的一端一体成型连接设置有第一挤压弹簧、第一挤压弹簧的另一端一体成型设置在挤压块的一侧,通过本发明对于在进行后浇带封堵时,能够墙体进行很好的固定支撑,提高支撑固定稳固性,便于后浇带封堵工作的进行,提高封堵成功率,保证施工质量,提升混凝土墙的观感质量。
Vertical post-cast strip plugging measure
一种竖向后浇带封堵措施
WANG HAIQUAN (author) / TAN BING (author) / FENG SHUO (author) / DING SHUNLONG (author)
2020-08-07
Patent
Electronic Resource
Chinese
Post-cast strip side wall plugging device and post-cast strip side wall plugging construction method
European Patent Office | 2024
|Basement bottom plate post-cast strip plugging structure
European Patent Office | 2024
|Post-cast strip plugging structure and construction method thereof
European Patent Office | 2020
|Member capable of continuously plugging basement post-cast strip
European Patent Office | 2024
|