A platform for research: civil engineering, architecture and urbanism
The invention belongs to the technical field of building construction, and particularly discloses a prefabricated line construction method of a residential building wallboard. The method comprises thefollowing steps that firstly, the elevation and the left and right positions of a prefabricated line body are determined on a wall body, and then a plurality of first fixing holes, second fixing holes, inserting grooves and fixing grooves are formed at equal intervals in the direction of the prefabricated line body; the surface of the position, where the prefabricated line body needs to be installed, on the wall body is cleaned; a plurality of inserting rods are fixedly connected to the prefabricated line body; the cleaned wall body is coated with an adhesive, then the prefabricated line bodyis adhered to the wall body through the adhesive, and the inserting rods are embedded into the inserting grooves in the adhering process; and then fastening screws penetrate through the second fixingholes and the first fixing holes to be connected with the prefabricated line body, after connection, one ends of the fastening screws are sleeved with nuts, and therefore installation of the prefabricated line body is completed. According to the method, the prefabricated line body can be conveniently installed and disassembled, operation is easy, and the stability is high.
本发明属于建筑施工技术领域,具体公开了一种住宅楼墙板的预制线条施工方法,包括以下步骤:首先,在墙体上将预制线条本体的标高以及左右位置定出,之后,沿着预制线条本体的方向等间隔开设有若干第一固定孔、第二固定孔、插槽以及固定槽;对墙体上需要安装预制线条本体的位置表面进行清理;在预制线条本体上固接有若干插杆;在清理后的墙体上涂覆有粘合剂,之后,将预制线条本体通过粘合剂黏附在墙体上,在粘接的过程中插杆嵌入到插槽内;之后,将紧固螺杆穿过第二固定孔以及第一固定孔后与预制线条本体连接,连接后,在紧固螺杆的一端套有螺帽,从而完成预制线条本体的安装;本发明便于对预制线条主体的安装和拆卸,操作简单,稳定性高。
The invention belongs to the technical field of building construction, and particularly discloses a prefabricated line construction method of a residential building wallboard. The method comprises thefollowing steps that firstly, the elevation and the left and right positions of a prefabricated line body are determined on a wall body, and then a plurality of first fixing holes, second fixing holes, inserting grooves and fixing grooves are formed at equal intervals in the direction of the prefabricated line body; the surface of the position, where the prefabricated line body needs to be installed, on the wall body is cleaned; a plurality of inserting rods are fixedly connected to the prefabricated line body; the cleaned wall body is coated with an adhesive, then the prefabricated line bodyis adhered to the wall body through the adhesive, and the inserting rods are embedded into the inserting grooves in the adhering process; and then fastening screws penetrate through the second fixingholes and the first fixing holes to be connected with the prefabricated line body, after connection, one ends of the fastening screws are sleeved with nuts, and therefore installation of the prefabricated line body is completed. According to the method, the prefabricated line body can be conveniently installed and disassembled, operation is easy, and the stability is high.
本发明属于建筑施工技术领域,具体公开了一种住宅楼墙板的预制线条施工方法,包括以下步骤:首先,在墙体上将预制线条本体的标高以及左右位置定出,之后,沿着预制线条本体的方向等间隔开设有若干第一固定孔、第二固定孔、插槽以及固定槽;对墙体上需要安装预制线条本体的位置表面进行清理;在预制线条本体上固接有若干插杆;在清理后的墙体上涂覆有粘合剂,之后,将预制线条本体通过粘合剂黏附在墙体上,在粘接的过程中插杆嵌入到插槽内;之后,将紧固螺杆穿过第二固定孔以及第一固定孔后与预制线条本体连接,连接后,在紧固螺杆的一端套有螺帽,从而完成预制线条本体的安装;本发明便于对预制线条主体的安装和拆卸,操作简单,稳定性高。
Prefabricated line construction method of residential building wallboard
一种住宅楼墙板的预制线条施工方法
SHEN LU (author)
2020-08-07
Patent
Electronic Resource
Chinese
IPC:
E04F
FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
,
Ausbau von Bauwerken, z.B. Treppen, Fußböden
Supporting mechanism for prefabricated building prefabricated wallboard construction
European Patent Office | 2024
|Prefabricated building prefabricated wallboard structure
European Patent Office | 2023
|