A platform for research: civil engineering, architecture and urbanism
Integral lifting device for steel structure platform and construction method of integral lifting device
The invention relates to the technical field of building steel structure mounting construction, in particular to an integral lifting device for a steel structure platform and a construction method ofthe integral lifting device. According to the technical scheme adopted by the invention, the integral lifting device comprise two building main bodies and a steel platform which is positioned betweenthe two building main bodies, wherein temporary hangers are arranged on the steel platform; lifting platforms are arranged on the two building main bodies; lifters are arranged on the lifting platforms; steel strands are connected on the lifters; ends, away from the lifters, of the steel strands are connected to the temporary hangers; guide rails are arranged on the two building main bodies; the guide rails are arranged in a height direction of the building main body; guide slots are formed in side surfaces, close to the steel platform, of the guide rails; the guide slots are formed in the length direction of the guide rails; limiting rods are arranged on the steel platform; and ends, away from the steel platform, of the limiting rods are in sliding connection to the guide slots. The integral lifting device has the effects of stably improving the steel platform, and being high in safety.
本发明涉及建筑钢结构安装施工技术领域,尤其是涉及一种钢结构平台整体提升装置及其施工方法,其技术方案包括两座建筑主体和钢平台,钢平台位于两座建筑主体之间,钢平台上设有临时吊具,两座建筑主体上均设有提升平台,提升平台上设有提升器,提升器上连接有钢绞线,钢绞线远离提升器的一端和临时吊具连接,两座建筑主体上均设有导轨,导轨沿建筑主体高度方向设置,导轨靠近钢平台的侧面设有导槽,导槽沿导轨的长度方向设置,钢平台上设有限位杆,限位杆远离钢平台的一端和导槽滑动连接。本发明具有钢平台提升平稳、安全性高的效果。
Integral lifting device for steel structure platform and construction method of integral lifting device
The invention relates to the technical field of building steel structure mounting construction, in particular to an integral lifting device for a steel structure platform and a construction method ofthe integral lifting device. According to the technical scheme adopted by the invention, the integral lifting device comprise two building main bodies and a steel platform which is positioned betweenthe two building main bodies, wherein temporary hangers are arranged on the steel platform; lifting platforms are arranged on the two building main bodies; lifters are arranged on the lifting platforms; steel strands are connected on the lifters; ends, away from the lifters, of the steel strands are connected to the temporary hangers; guide rails are arranged on the two building main bodies; the guide rails are arranged in a height direction of the building main body; guide slots are formed in side surfaces, close to the steel platform, of the guide rails; the guide slots are formed in the length direction of the guide rails; limiting rods are arranged on the steel platform; and ends, away from the steel platform, of the limiting rods are in sliding connection to the guide slots. The integral lifting device has the effects of stably improving the steel platform, and being high in safety.
本发明涉及建筑钢结构安装施工技术领域,尤其是涉及一种钢结构平台整体提升装置及其施工方法,其技术方案包括两座建筑主体和钢平台,钢平台位于两座建筑主体之间,钢平台上设有临时吊具,两座建筑主体上均设有提升平台,提升平台上设有提升器,提升器上连接有钢绞线,钢绞线远离提升器的一端和临时吊具连接,两座建筑主体上均设有导轨,导轨沿建筑主体高度方向设置,导轨靠近钢平台的侧面设有导槽,导槽沿导轨的长度方向设置,钢平台上设有限位杆,限位杆远离钢平台的一端和导槽滑动连接。本发明具有钢平台提升平稳、安全性高的效果。
Integral lifting device for steel structure platform and construction method of integral lifting device
一种钢结构平台整体提升装置及其施工方法
CHEN YAZHOU (author) / LIN LIYAN (author) / CHEN YIJI (author) / ZHANG ZHEN (author) / YE CAIJUN (author)
2020-08-07
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Integral lifting construction method for steel structure lifting roof
European Patent Office | 2023
|European Patent Office | 2023
|Lifting device for integral steel framework construction
European Patent Office | 2022
|Integral lifting device for large-span steel structure and using method of integral lifting device
European Patent Office | 2023
|