A platform for research: civil engineering, architecture and urbanism
Supporting hanger green construction integration system
The invention relates to a supporting hanger green construction integration system. The supporting hanger green construction integration system comprises an enclosure wall, an accessory storage station, a processing workstation, an assembly workstation, a finished product storage station and an office moving workstation, wherein the accessory storage station, the processing workstation, the assembly workstation, the finished product storage station and the office moving workstation are arranged in the enclosure wall. The enclosure wall is formed by assembling a plurality of groups of prefabricated enclosure blocking pieces. One side of the enclosure wall is provided with an access opening provided with the office moving workstation. One side of the office moving workstation is provided with the finished product storage station. The assembly workstation is arranged opposite the finished product storage station and is used for assembling a profile steel fitting. One side of the assemblyworkstation is provided with the processing workstation used for punching, cutting and welding the profile steel fitting. One end of the processing workstation and one end of the assembly workstationare respectively provided with a fitting storage station used for storing profile steel fittings. The production and assembly of supporting hangers are centralized, so that the problem that a plurality of sets of equipment and accessories are placed at any place is avoided. The supporting hangers are processed and assembled in a streamline mode, so that the assembly efficiency is effectively improved.
本发明涉及一种支吊架绿色施工集成系统,包括围墙以及设置在围墙中的配件储存站、加工工作站、组装工作站、成品储存站和办公移动工作站,围墙由多组预制围挡组装而成,围墙一侧设有出入口,围墙的出入口处设置办公移动工作站,办公移动工作站的一侧设置成品储存站,成品储存站的对面设置组装工作站,组装工作站用于对型钢配件进行组装,组装工作站的一侧设置加工工作站,加工工作站用于对型钢配件进行冲孔、切断和焊接作业,加工工作站和组装工作站的一端均设置一个配件储存站,配件储存站用于储存型钢配件装。支吊架的生产装配集中化,避免出现各种设备和配件随处摆放的问题,采用流水线式对支吊架进行加工组装,有效提高了装配效率。
Supporting hanger green construction integration system
The invention relates to a supporting hanger green construction integration system. The supporting hanger green construction integration system comprises an enclosure wall, an accessory storage station, a processing workstation, an assembly workstation, a finished product storage station and an office moving workstation, wherein the accessory storage station, the processing workstation, the assembly workstation, the finished product storage station and the office moving workstation are arranged in the enclosure wall. The enclosure wall is formed by assembling a plurality of groups of prefabricated enclosure blocking pieces. One side of the enclosure wall is provided with an access opening provided with the office moving workstation. One side of the office moving workstation is provided with the finished product storage station. The assembly workstation is arranged opposite the finished product storage station and is used for assembling a profile steel fitting. One side of the assemblyworkstation is provided with the processing workstation used for punching, cutting and welding the profile steel fitting. One end of the processing workstation and one end of the assembly workstationare respectively provided with a fitting storage station used for storing profile steel fittings. The production and assembly of supporting hangers are centralized, so that the problem that a plurality of sets of equipment and accessories are placed at any place is avoided. The supporting hangers are processed and assembled in a streamline mode, so that the assembly efficiency is effectively improved.
本发明涉及一种支吊架绿色施工集成系统,包括围墙以及设置在围墙中的配件储存站、加工工作站、组装工作站、成品储存站和办公移动工作站,围墙由多组预制围挡组装而成,围墙一侧设有出入口,围墙的出入口处设置办公移动工作站,办公移动工作站的一侧设置成品储存站,成品储存站的对面设置组装工作站,组装工作站用于对型钢配件进行组装,组装工作站的一侧设置加工工作站,加工工作站用于对型钢配件进行冲孔、切断和焊接作业,加工工作站和组装工作站的一端均设置一个配件储存站,配件储存站用于储存型钢配件装。支吊架的生产装配集中化,避免出现各种设备和配件随处摆放的问题,采用流水线式对支吊架进行加工组装,有效提高了装配效率。
Supporting hanger green construction integration system
一种支吊架绿色施工集成系统
SONG YUBEI (author) / ZHAO PENG (author) / LIU JICAI (author) / CHEN LI (author)
2020-08-07
Patent
Electronic Resource
Chinese
Unbonded prestressed floor reconstruction holing construction method and supporting hanger structure
European Patent Office | 2023
|