Complete equipment for rapid disassembly and replacement of tunnel inverts and construction method
The invention relates to complete equipment for rapid disassembly and replacement of tunnel inverts and a construction method, and belongs to the technical field of tunnel engineering. The complete equipment comprises locking angle anchor rods driven into the side walls of two sides of a tunnel, angle steel welded to the ends of the locking angle anchor rods, a guide rail installed on the angle steel, a workbench arranged on the guide rail, a power source and a control system, wherein the power source and the control system are arranged on the workbench, the workbench is composed of a truss, avertical chord member and two parallel cross beams, the cross beams are fixedly connected with the truss through the vertical chord member and slidably connected with the guide rail; the control system is composed of an operating room, a mechanical arm and construction equipment, the construction equipment is connected to the operating room through the mechanical arm, and the operating room is connected with the power source. The problems of complicated procedures for removing and replacing inverts currently, low efficiency, difficulty in guaranteeing construction quality and long construction period are solved.
本发明的一种隧道仰拱快速拆换成套装备及施工方法,属于隧道工程技术领域,该成套装备包括在隧道两侧边墙打入的锁角锚杆、在锁角锚杆端部焊接的角钢、在角钢上安装的导轨、在导轨上设置的工作台以及在工作台上设置的动力源和操控系统,工作台由桁架、竖弦杆、横梁组成,横梁设置为并列的两根,并通过竖弦杆与桁架固定连接,且与导轨滑动连接;操控系统由操作室、机械臂和施工机具组成,施工机具通过机械臂与操作室连接,操作室与动力源连接。本发明解决了当前仰拱拆换仰拱工序繁杂、效率低下、施工质量难以保证、施工周期长等问题。
Complete equipment for rapid disassembly and replacement of tunnel inverts and construction method
The invention relates to complete equipment for rapid disassembly and replacement of tunnel inverts and a construction method, and belongs to the technical field of tunnel engineering. The complete equipment comprises locking angle anchor rods driven into the side walls of two sides of a tunnel, angle steel welded to the ends of the locking angle anchor rods, a guide rail installed on the angle steel, a workbench arranged on the guide rail, a power source and a control system, wherein the power source and the control system are arranged on the workbench, the workbench is composed of a truss, avertical chord member and two parallel cross beams, the cross beams are fixedly connected with the truss through the vertical chord member and slidably connected with the guide rail; the control system is composed of an operating room, a mechanical arm and construction equipment, the construction equipment is connected to the operating room through the mechanical arm, and the operating room is connected with the power source. The problems of complicated procedures for removing and replacing inverts currently, low efficiency, difficulty in guaranteeing construction quality and long construction period are solved.
本发明的一种隧道仰拱快速拆换成套装备及施工方法,属于隧道工程技术领域,该成套装备包括在隧道两侧边墙打入的锁角锚杆、在锁角锚杆端部焊接的角钢、在角钢上安装的导轨、在导轨上设置的工作台以及在工作台上设置的动力源和操控系统,工作台由桁架、竖弦杆、横梁组成,横梁设置为并列的两根,并通过竖弦杆与桁架固定连接,且与导轨滑动连接;操控系统由操作室、机械臂和施工机具组成,施工机具通过机械臂与操作室连接,操作室与动力源连接。本发明解决了当前仰拱拆换仰拱工序繁杂、效率低下、施工质量难以保证、施工周期长等问题。
Complete equipment for rapid disassembly and replacement of tunnel inverts and construction method
一种隧道仰拱快速拆换成套装备及施工方法
WANG DAOLIANG (author) / LIAO JUN (author) / YU SHUN (author) / LIU QIUZHUO (author) / WANG LUSHI (author) / WANG KUN (author) / ZHENG XIXI (author) / WU WENPING (author)
2020-08-14
Patent
Electronic Resource
Chinese
IPC:
E21F
Sicherheitsvorrichtungen, Förderung, Auffüllen oder Bergversatz, Rettungswesen, Bewetterung oder Entwässerung in oder von Gruben oder Tunnels
,
SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINAGE IN OR OF MINES OR TUNNELS
/
E02F
Baggern
,
DREDGING
/
E21D
SHAFTS
,
Schächte
Engineering Index Backfile | 1950
|Slope profile measurement of sewer inverts
British Library Online Contents | 2014
|Slope profile measurement of sewer inverts
Online Contents | 2014
|Inverts and side walls of aqueducts
Engineering Index Backfile | 1889
OBSERVER - PROFILE Seattle's Lead Pencil Studio inverts a typology
Online Contents | 2006