A platform for research: civil engineering, architecture and urbanism
Steel structure foundation bolt pre-embedding construction method
The invention provides a steel structure foundation bolt pre-embedding construction method, and belongs to the field of steel structures. The steel structure foundation bolt pre-embedding constructionmethod comprises the specific steps of construction preparation, foundation structure steel bar net rack binding, foundation structure formwork installation, independent support system installation,shaping mold and independent support system in-place adjustment, pre-embedded bolt in-place initial adjustment, pre-embedded bolt precise adjustment, bolt and shaping mold fixing, quality acceptance,steel structure foundation concrete one-time pouring, concrete curing and finished product protection. A shaping mold steel plate is adopted for fixing a pre-embedded bolt, so that the relative position of the bolt in a bolt set is kept accurate; an independent support system and a shaping mold are used for adjusting the pre-embedded bolt in an all-dimensional manner, fine adjustment is achieved,the construction operation precision is high, and the overall deviation is small; and steel pipe foot hand rods and fastener turnover materials are fully utilized, and the engineering input is saved.
本发明提供一种钢结构基础地脚螺栓预埋施工工法,属于钢结构领域,该钢结构基础地脚螺栓预埋施工工法具体步骤为施工准备,基础结构钢筋网架绑扎,基础结构模板安装,独立支架系统安装,定型模具与独立支架系统就位调整,预埋螺栓就位初调,预埋螺栓精准调整,螺栓、定型模具固定,质量验收,钢结构基础混凝土一次性浇筑,混凝土养护与成品保护。本发明采用定型模具钢板固定预埋螺栓,使螺栓组内的螺栓相对位置保持准确;利用独立的支架系统和定型模具全方位调整预埋螺栓,并具有微调性,施工操作精度高,整体偏差小;充分利用钢管脚手杆和扣件周转材料,节省工程投入。
Steel structure foundation bolt pre-embedding construction method
The invention provides a steel structure foundation bolt pre-embedding construction method, and belongs to the field of steel structures. The steel structure foundation bolt pre-embedding constructionmethod comprises the specific steps of construction preparation, foundation structure steel bar net rack binding, foundation structure formwork installation, independent support system installation,shaping mold and independent support system in-place adjustment, pre-embedded bolt in-place initial adjustment, pre-embedded bolt precise adjustment, bolt and shaping mold fixing, quality acceptance,steel structure foundation concrete one-time pouring, concrete curing and finished product protection. A shaping mold steel plate is adopted for fixing a pre-embedded bolt, so that the relative position of the bolt in a bolt set is kept accurate; an independent support system and a shaping mold are used for adjusting the pre-embedded bolt in an all-dimensional manner, fine adjustment is achieved,the construction operation precision is high, and the overall deviation is small; and steel pipe foot hand rods and fastener turnover materials are fully utilized, and the engineering input is saved.
本发明提供一种钢结构基础地脚螺栓预埋施工工法,属于钢结构领域,该钢结构基础地脚螺栓预埋施工工法具体步骤为施工准备,基础结构钢筋网架绑扎,基础结构模板安装,独立支架系统安装,定型模具与独立支架系统就位调整,预埋螺栓就位初调,预埋螺栓精准调整,螺栓、定型模具固定,质量验收,钢结构基础混凝土一次性浇筑,混凝土养护与成品保护。本发明采用定型模具钢板固定预埋螺栓,使螺栓组内的螺栓相对位置保持准确;利用独立的支架系统和定型模具全方位调整预埋螺栓,并具有微调性,施工操作精度高,整体偏差小;充分利用钢管脚手杆和扣件周转材料,节省工程投入。
Steel structure foundation bolt pre-embedding construction method
一种钢结构基础地脚螺栓预埋施工工法
YU XIUYAN (author) / GAO DEFENG (author) / GUO JIE (author) / YANG YONGQING (author) / YU LONG (author) / WU XIAOLONG (author) / LI JING (author) / LIU PING (author) / FU DONGDONG (author) / ZHANG DAN (author)
2020-08-18
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Steel structure column foundation bolt pre-embedding construction method
European Patent Office | 2023
|Steel-reinforced column foundation bolt embedding structure
European Patent Office | 2021
|Steel structure foundation bolt accurate pre-embedding device
European Patent Office | 2022
|Foundation bolt pre-embedding positioning device and construction method thereof
European Patent Office | 2022
|FOUNDATION BOLT PRE-EMBEDDING POSITIONING MOLD AND METHOD FOR MOUNTING FOUNDATION BOLT
European Patent Office | 2022
|