A platform for research: civil engineering, architecture and urbanism
Aluminum-wood mixed formwork structure and construction method thereof
The invention relates to the technical field of constructional engineering, and discloses an aluminum-wood mixed formwork structure and a construction method thereof. The aluminum-wood mixed formworkstructure comprises aluminum formworks, wood formworks, a keel assembly, a back arris assembly and an inclined strut member, wherein the aluminum formworks are arranged on the side face of a wall to be poured, and a plurality of aluminum formworks arranged on the same side are sequentially arranged in the horizontal direction; the wood formworks are arranged on the side face of the wall to be poured, and the wood formworks and the aluminum formworks jointly enclose the wall to be poured; the keel assembly comprises main keels arranged in the horizontal direction and secondary keels arranged inthe vertical direction, the main keels are connected with the wood formworks arranged at the position of the side wall of the wall to be poured, and the secondary keels are connected with the wood formworks arranged at the position of the non-side wall of the wall to be poured; the back arris assembly is used for reinforcing the aluminum formworks and the wood formworks and comprises first back arrises, and the first back arrises can fix the aluminum formworks and the secondary keels at the same time; and the first end of the inclined strut member is connected with the ground, and the secondend is connected with the back arris assembly. According to the aluminum-wood mixed formwork structure, the construction efficiency can be improved, and the construction cost can be reduced.
本发明涉及建筑工程技术领域,公开一种铝木混合模板结构及其施工方法,其中铝木混合模板结构包括:铝模板,设于待浇筑的墙体的侧面,设于同一侧的若干铝模板沿水平方向依次排列;木模板,设于待浇筑的墙体的侧面,木模板与铝模板共同围蔽待浇筑的墙体;龙骨组件,包括沿水平方向设置的主龙骨和沿竖直方向设置的次龙骨,主龙骨与设于待浇筑的墙体的侧帮位置上的木模板连接,次龙骨与设于待浇筑的墙体的非侧帮位置上的木模板连接;背楞组件,用于加固铝模板和木模板,包括第一背楞,第一背楞能够同时固定铝模板和次龙骨;以及斜撑件,第一端与地面连接,第二端与背楞组件连接。本发明提供的铝木混合模板结构能够提高施工效率、降低施工成本。
Aluminum-wood mixed formwork structure and construction method thereof
The invention relates to the technical field of constructional engineering, and discloses an aluminum-wood mixed formwork structure and a construction method thereof. The aluminum-wood mixed formworkstructure comprises aluminum formworks, wood formworks, a keel assembly, a back arris assembly and an inclined strut member, wherein the aluminum formworks are arranged on the side face of a wall to be poured, and a plurality of aluminum formworks arranged on the same side are sequentially arranged in the horizontal direction; the wood formworks are arranged on the side face of the wall to be poured, and the wood formworks and the aluminum formworks jointly enclose the wall to be poured; the keel assembly comprises main keels arranged in the horizontal direction and secondary keels arranged inthe vertical direction, the main keels are connected with the wood formworks arranged at the position of the side wall of the wall to be poured, and the secondary keels are connected with the wood formworks arranged at the position of the non-side wall of the wall to be poured; the back arris assembly is used for reinforcing the aluminum formworks and the wood formworks and comprises first back arrises, and the first back arrises can fix the aluminum formworks and the secondary keels at the same time; and the first end of the inclined strut member is connected with the ground, and the secondend is connected with the back arris assembly. According to the aluminum-wood mixed formwork structure, the construction efficiency can be improved, and the construction cost can be reduced.
本发明涉及建筑工程技术领域,公开一种铝木混合模板结构及其施工方法,其中铝木混合模板结构包括:铝模板,设于待浇筑的墙体的侧面,设于同一侧的若干铝模板沿水平方向依次排列;木模板,设于待浇筑的墙体的侧面,木模板与铝模板共同围蔽待浇筑的墙体;龙骨组件,包括沿水平方向设置的主龙骨和沿竖直方向设置的次龙骨,主龙骨与设于待浇筑的墙体的侧帮位置上的木模板连接,次龙骨与设于待浇筑的墙体的非侧帮位置上的木模板连接;背楞组件,用于加固铝模板和木模板,包括第一背楞,第一背楞能够同时固定铝模板和次龙骨;以及斜撑件,第一端与地面连接,第二端与背楞组件连接。本发明提供的铝木混合模板结构能够提高施工效率、降低施工成本。
Aluminum-wood mixed formwork structure and construction method thereof
一种铝木混合模板结构及其施工方法
XUN WENLIANG (author) / MA ZIYUE (author) / ZHANG YUMENG (author)
2020-08-18
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Aluminum formwork and wood formwork connecting structure and construction method thereof
European Patent Office | 2024
|Aluminum-wood mixed formwork applied to building construction
European Patent Office | 2021
|Aluminum alloy formwork and wood formwork combined structure and construction method
European Patent Office | 2023
|Aluminum alloy formwork and wood formwork combined structure and construction method
European Patent Office | 2021
|European Patent Office | 2023
|