A platform for research: civil engineering, architecture and urbanism
The invention provides a dredging device of a water conservancy project. The dredging device of the water conservancy project effectively solves the problem that operation is complicated and secondarypollution is prone to occurring during river channel dredging. The dredging device of the water conservancy project comprises a hull and a dredging tank, the side edge of the dredging tank is fixedlyconnected with a power box and a filter pressing box, the dredging tank is parallel to the front end of the power box, cuspidal edges are arranged on the dredging tank, the inside of the dredging tank is divided into a first cavity, a second cavity, a third cavity and a fourth cavity, a mud inlet located at the front end of the third cavity is formed in the dredging tank, a first filter screen isinstalled between the first cavity and the third cavity, the side edge of the first cavity is connected with a water pumping pipeline, the second cavity is connected with the filter pressing box, a second filter screen is arranged at the rear end of the fourth cavity, the mud outlet end of the filter pressing box is connected with the hull, a water outlet is formed in the bottom of the filter pressing box, and the power box controls the operation of a first separation mechanism and a second separation mechanism and the progress of the equipment. The dredging device of the water conservancy project is clever in structure, and the split-type structure can adapt to various construction environments, river water carrying during dredging can be reduced, the dredging cost is reduced, and the dredging efficiency is improved.
水利工程清淤装置,有效的解决了河道清淤时操作复杂,易产生二次污染的问题;包括船体和清淤箱,清淤箱侧边固定连接有动力箱和压滤箱,清淤箱和动力箱前端并列且设有尖棱,清淤箱内部分第一腔体、第二腔体、第三腔体和第四腔体,清淤箱上设有位于第三腔体前端的进泥口,第一腔体和第三腔体之间安装有第一滤网,第一腔体侧边连接抽水管道,第二腔体连接压滤箱,第四腔体后端设有第二滤网,压滤箱出泥端连接船体,压滤箱底部设有出水口,动力箱控制第一分隔机构和第二分隔机构的运转以及设备的行进;本发明结构巧妙,分体式结构能够适应各种不同的施工环境,清淤时减少河水的携带,降低清淤成本,提高清淤效率。
The invention provides a dredging device of a water conservancy project. The dredging device of the water conservancy project effectively solves the problem that operation is complicated and secondarypollution is prone to occurring during river channel dredging. The dredging device of the water conservancy project comprises a hull and a dredging tank, the side edge of the dredging tank is fixedlyconnected with a power box and a filter pressing box, the dredging tank is parallel to the front end of the power box, cuspidal edges are arranged on the dredging tank, the inside of the dredging tank is divided into a first cavity, a second cavity, a third cavity and a fourth cavity, a mud inlet located at the front end of the third cavity is formed in the dredging tank, a first filter screen isinstalled between the first cavity and the third cavity, the side edge of the first cavity is connected with a water pumping pipeline, the second cavity is connected with the filter pressing box, a second filter screen is arranged at the rear end of the fourth cavity, the mud outlet end of the filter pressing box is connected with the hull, a water outlet is formed in the bottom of the filter pressing box, and the power box controls the operation of a first separation mechanism and a second separation mechanism and the progress of the equipment. The dredging device of the water conservancy project is clever in structure, and the split-type structure can adapt to various construction environments, river water carrying during dredging can be reduced, the dredging cost is reduced, and the dredging efficiency is improved.
水利工程清淤装置,有效的解决了河道清淤时操作复杂,易产生二次污染的问题;包括船体和清淤箱,清淤箱侧边固定连接有动力箱和压滤箱,清淤箱和动力箱前端并列且设有尖棱,清淤箱内部分第一腔体、第二腔体、第三腔体和第四腔体,清淤箱上设有位于第三腔体前端的进泥口,第一腔体和第三腔体之间安装有第一滤网,第一腔体侧边连接抽水管道,第二腔体连接压滤箱,第四腔体后端设有第二滤网,压滤箱出泥端连接船体,压滤箱底部设有出水口,动力箱控制第一分隔机构和第二分隔机构的运转以及设备的行进;本发明结构巧妙,分体式结构能够适应各种不同的施工环境,清淤时减少河水的携带,降低清淤成本,提高清淤效率。