A platform for research: civil engineering, architecture and urbanism
Construction method for road in relocated town
The invention discloses a construction method for a road in a relocated town. The construction method comprises the steps of surveying and setting out, roadbed construction, graded broken stone hardcore construction, concrete stable layer construction and pavement concrete layer construction. According to the method, the roadbed is treated, then construction is conducted according to the structural sequence of the graded broken stone hardcore, the concrete stable layer and the pavement concrete layer, the construction quality can be guaranteed, the road appearance is smooth, wheel marks do notexist, joints are good, the compaction quality is good, and the method is suitable for roads in a relocated town. According to a rod piece positioning device, a plurality of sliding blocks, namely aplurality of positioning pipes, can be installed according to needs, the rod piece is convenient to install and position, a template does not need to be punched, and the rod piece positioning device is convenient and flexible to operate.
本发明公开了一种迁建集镇内道路施工方法,包括测量放线、路基施工、级配碎石垫层施工、混凝土稳定层施工以及路面混凝土层施工步骤。本发明方法对路基处理,然后按级配碎石垫层、混凝土稳定层以及路面混凝土层的结构顺序进行施工,能够保障施工质量,道路外观平整、无轮迹、接缝处良好,压实质量良好,适用于迁建集镇内道路;本发明的杆件定位装置可根据需要安装多个滑块,即多个定位管,方便安装以及定位杆件,无需对模板进行打孔,具有操作方便、灵活的优点。
Construction method for road in relocated town
The invention discloses a construction method for a road in a relocated town. The construction method comprises the steps of surveying and setting out, roadbed construction, graded broken stone hardcore construction, concrete stable layer construction and pavement concrete layer construction. According to the method, the roadbed is treated, then construction is conducted according to the structural sequence of the graded broken stone hardcore, the concrete stable layer and the pavement concrete layer, the construction quality can be guaranteed, the road appearance is smooth, wheel marks do notexist, joints are good, the compaction quality is good, and the method is suitable for roads in a relocated town. According to a rod piece positioning device, a plurality of sliding blocks, namely aplurality of positioning pipes, can be installed according to needs, the rod piece is convenient to install and position, a template does not need to be punched, and the rod piece positioning device is convenient and flexible to operate.
本发明公开了一种迁建集镇内道路施工方法,包括测量放线、路基施工、级配碎石垫层施工、混凝土稳定层施工以及路面混凝土层施工步骤。本发明方法对路基处理,然后按级配碎石垫层、混凝土稳定层以及路面混凝土层的结构顺序进行施工,能够保障施工质量,道路外观平整、无轮迹、接缝处良好,压实质量良好,适用于迁建集镇内道路;本发明的杆件定位装置可根据需要安装多个滑块,即多个定位管,方便安装以及定位杆件,无需对模板进行打孔,具有操作方便、灵活的优点。
Construction method for road in relocated town
一种迁建集镇内道路施工方法
LIN LUJUN (author) / WANG DEWEI (author) / GU QIANG (author) / ZHANG XIAOLONG (author) / WANG FANG (author)
2020-08-25
Patent
Electronic Resource
Chinese
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
Thai hazwaste facility to be relocated
Online Contents | 1996
What (can) Change After Being Relocated
British Library Conference Proceedings | 1993
|British Library Online Contents | 2010
|Electric power to dredge a relocated river channel
Engineering Index Backfile | 1916
|Campus for Southampton University's relocated faculty of arts
British Library Online Contents | 1996
|