A platform for research: civil engineering, architecture and urbanism
Pile driving device for building engineering construction process
The invention discloses a pile driving device for a building engineering construction process and relates to the technical field of building engineering apparatuses. The pile driving device comprisesa base and a base plate. A plurality of first ear plates are fixedly in an equally spaced manner on a surface of the base, and one ends of the first ear plates are rotatably connected to first liftingrods through first hinge pins; a plurality of second ear plates are fixed in an equally spaced manner on a surface of the base plate, and one ends of the second ear plates are rotatably connected tosecond lifting rods through second hinge pins; one ends of the first lifting rods are rotatably connected to connecting blocks, one ends of the second lifting rods are rotatably connected to the connecting blocks, rotating shafts are in transmission connection between oppositely arranged connecting blocks, and one ends of the two rotating shafts arranged adjacently are in transmission connection to a first driving mechanism through belts. By using the first lifting rods, the second lifting rods and a clamping rod, the pile driving device solves the problems that an existing pile driving devicecannot adjust the height to change the counterweight falling speed and the stability of a pile foundation is affected as the pile foundation is not fixed during pile driving.
本发明公开了一种用于建筑工程施工过程中的打桩装置,涉及建筑工程器械技术领域。本发明包括底座和基板,底座的一表面等距固定有若干第一耳板,第一耳板的一端通过第一销轴转动连接有第一升降杆;基板的一表面等距固定有若干第二耳板,第二耳板的一端通过第二销轴转动连接有第二升降杆;第一升降杆一端转动连接有连接块,第二升降杆的一端与连接块转动连接,相对设置的连接块之间传动连接有转动轴,相邻设置的两转动轴的一端通过皮带与第一驱动机构传动连接。本发明通过第一升降杆、第二升降杆、夹紧杆的使用,解决了现有打桩装置无法通过调节自身高度来改变重锤下落的速度,而且在打桩时对桩基不加固定,影响桩基稳定性的问题。
Pile driving device for building engineering construction process
The invention discloses a pile driving device for a building engineering construction process and relates to the technical field of building engineering apparatuses. The pile driving device comprisesa base and a base plate. A plurality of first ear plates are fixedly in an equally spaced manner on a surface of the base, and one ends of the first ear plates are rotatably connected to first liftingrods through first hinge pins; a plurality of second ear plates are fixed in an equally spaced manner on a surface of the base plate, and one ends of the second ear plates are rotatably connected tosecond lifting rods through second hinge pins; one ends of the first lifting rods are rotatably connected to connecting blocks, one ends of the second lifting rods are rotatably connected to the connecting blocks, rotating shafts are in transmission connection between oppositely arranged connecting blocks, and one ends of the two rotating shafts arranged adjacently are in transmission connection to a first driving mechanism through belts. By using the first lifting rods, the second lifting rods and a clamping rod, the pile driving device solves the problems that an existing pile driving devicecannot adjust the height to change the counterweight falling speed and the stability of a pile foundation is affected as the pile foundation is not fixed during pile driving.
本发明公开了一种用于建筑工程施工过程中的打桩装置,涉及建筑工程器械技术领域。本发明包括底座和基板,底座的一表面等距固定有若干第一耳板,第一耳板的一端通过第一销轴转动连接有第一升降杆;基板的一表面等距固定有若干第二耳板,第二耳板的一端通过第二销轴转动连接有第二升降杆;第一升降杆一端转动连接有连接块,第二升降杆的一端与连接块转动连接,相对设置的连接块之间传动连接有转动轴,相邻设置的两转动轴的一端通过皮带与第一驱动机构传动连接。本发明通过第一升降杆、第二升降杆、夹紧杆的使用,解决了现有打桩装置无法通过调节自身高度来改变重锤下落的速度,而且在打桩时对桩基不加固定,影响桩基稳定性的问题。
Pile driving device for building engineering construction process
一种用于建筑工程施工过程中的打桩装置
WANG HUJUN (author)
2020-08-25
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Engineering building pile driving device and construction method
European Patent Office | 2024
|Construction pile protection device in building construction process
European Patent Office | 2021
|Pile cutting device in green building pile foundation construction process
European Patent Office | 2021
|