A platform for research: civil engineering, architecture and urbanism
Pile beam foundation structure and construction method
The invention relates to a pile beam foundation structure and a construction method. According to the adopted technical scheme, the pile beam foundation structure comprises steel pipe piles, horizontal steel beams, first bolts, first cushion plates and second strengthening bars. By means of the pile beam foundation structure and the construction method, direct building can be achieved on the construction field through prefabricated components via bolts, a reinforced concrete structure is not needed, the trouble of steel bar binding and pouring of a large amount of concrete is saved, waiting ofconcrete curing time is also not needed, the construction period is short, and control is easy; and meanwhile, an excessively large pit foundation does not need to be excavated, the whole foundationstructure can be built above an underground pipeline, transformation of the underground pipeline in earthwork construction is effectively avoided, the whole structure and the construction scheme are fast and convenient to construct, the engineering amount is relatively small, and the construction cost can be effectively saved.
本发明涉及一种桩梁基础结构及施工方法。采用的技术方案是:包括钢管桩、水平钢梁、第一螺栓、第一垫板、第二加强筋。本发明通过预制构件在施工现场通过螺栓可以直接搭建,不需要钢筋混凝土结构,省去了钢筋绑扎及大量的浇筑混凝土的麻烦,也无需等待混凝土养护的时间,施工周期较短且易于把控,同时,不需要挖掘过大的坑基,可将整个基础结构搭建在地下管线上方,有效避免土方施工中对地下管线的改造,整个结构及施工方案施工快捷方便,工程量相对较小,可有效节省施工成本。
Pile beam foundation structure and construction method
The invention relates to a pile beam foundation structure and a construction method. According to the adopted technical scheme, the pile beam foundation structure comprises steel pipe piles, horizontal steel beams, first bolts, first cushion plates and second strengthening bars. By means of the pile beam foundation structure and the construction method, direct building can be achieved on the construction field through prefabricated components via bolts, a reinforced concrete structure is not needed, the trouble of steel bar binding and pouring of a large amount of concrete is saved, waiting ofconcrete curing time is also not needed, the construction period is short, and control is easy; and meanwhile, an excessively large pit foundation does not need to be excavated, the whole foundationstructure can be built above an underground pipeline, transformation of the underground pipeline in earthwork construction is effectively avoided, the whole structure and the construction scheme are fast and convenient to construct, the engineering amount is relatively small, and the construction cost can be effectively saved.
本发明涉及一种桩梁基础结构及施工方法。采用的技术方案是:包括钢管桩、水平钢梁、第一螺栓、第一垫板、第二加强筋。本发明通过预制构件在施工现场通过螺栓可以直接搭建,不需要钢筋混凝土结构,省去了钢筋绑扎及大量的浇筑混凝土的麻烦,也无需等待混凝土养护的时间,施工周期较短且易于把控,同时,不需要挖掘过大的坑基,可将整个基础结构搭建在地下管线上方,有效避免土方施工中对地下管线的改造,整个结构及施工方案施工快捷方便,工程量相对较小,可有效节省施工成本。
Pile beam foundation structure and construction method
一种桩梁基础结构及施工方法
XUE LIN (author) / DUAN LIANCUN (author) / YANG TAO (author) / ZHAN YUANRONG (author) / LI XIANLIANG (author) / WU YINGYING (author) / HU XIAOXIAO (author) / CHEN RONGJU (author) / LIU SHANPENG (author) / LI ZHEN (author)
2020-08-25
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
European Patent Office | 2015
|CONSTRUCTION METHOD FOR PILE FOUNDATION STRUCTURE, PILE FOUNDATION STRUCTURE AND FOUNDATION MEMBER
European Patent Office | 2016
|European Patent Office | 2021
|Pile foundation construction platform and pile foundation construction method
European Patent Office | 2020
|