A platform for research: civil engineering, architecture and urbanism
Frame type glass curtain wall installation method and glass curtain wall system
The invention provides a frame type glass curtain wall installation method and a glass curtain wall system. The frame type glass curtain wall installation method comprises the steps of machining and forming transverse keels and vertical keels which are used for installing glass; conveying the transverse keels, the vertical keels and connecting assemblies used for connecting the transverse keels and the vertical keels into a target floor, and installing the transverse keels, the vertical keels and the connecting assemblies to form a plurality of target keel modules; and installing the target keel modules in the target keel modules on a curtain wall through a crane according to a set installation sequence, and carrying out spot welding on each target keel module installed in place so as to form a target keel frame. According to the scheme, rapid assembly construction of the frame type curtain wall can be achieved, investment of measure cost is reduced, and meanwhile the construction period of a site is shortened.
本发明提供了一种框架式玻璃幕墙安装方法及玻璃幕墙系统,该框架式玻璃幕墙安装方法,包括:将用于安装玻璃的横龙骨和竖龙骨加工成型;将所述横龙骨、所述竖龙骨以及用于连接所述横龙骨和所述竖龙骨的连接组件运送到目标楼层内,并对所述横龙骨、所述竖龙骨和所述连接组件进行安装,以形成多个目标龙骨模块;将所述多个目标龙骨模块中的每一个目标龙骨模块通过吊机按照设定安装顺序安装到幕墙上,并对安装到位的每一个目标龙骨模块进行点焊,以形成目标龙骨框架。本发明的方案能够实现框架式幕墙的快速装配施工,减少措施费的投入,同时缩短现场的施工周期。
Frame type glass curtain wall installation method and glass curtain wall system
The invention provides a frame type glass curtain wall installation method and a glass curtain wall system. The frame type glass curtain wall installation method comprises the steps of machining and forming transverse keels and vertical keels which are used for installing glass; conveying the transverse keels, the vertical keels and connecting assemblies used for connecting the transverse keels and the vertical keels into a target floor, and installing the transverse keels, the vertical keels and the connecting assemblies to form a plurality of target keel modules; and installing the target keel modules in the target keel modules on a curtain wall through a crane according to a set installation sequence, and carrying out spot welding on each target keel module installed in place so as to form a target keel frame. According to the scheme, rapid assembly construction of the frame type curtain wall can be achieved, investment of measure cost is reduced, and meanwhile the construction period of a site is shortened.
本发明提供了一种框架式玻璃幕墙安装方法及玻璃幕墙系统,该框架式玻璃幕墙安装方法,包括:将用于安装玻璃的横龙骨和竖龙骨加工成型;将所述横龙骨、所述竖龙骨以及用于连接所述横龙骨和所述竖龙骨的连接组件运送到目标楼层内,并对所述横龙骨、所述竖龙骨和所述连接组件进行安装,以形成多个目标龙骨模块;将所述多个目标龙骨模块中的每一个目标龙骨模块通过吊机按照设定安装顺序安装到幕墙上,并对安装到位的每一个目标龙骨模块进行点焊,以形成目标龙骨框架。本发明的方案能够实现框架式幕墙的快速装配施工,减少措施费的投入,同时缩短现场的施工周期。
Frame type glass curtain wall installation method and glass curtain wall system
框架式玻璃幕墙安装方法及玻璃幕墙系统
PAN YUPO (author) / ZHOU XIN (author) / LIU YONGHUA (author) / YU BAIYING (author) / WEN LIANHU (author)
2020-08-25
Patent
Electronic Resource
Chinese
Curtain wall decoration frame and glass curtain wall structure
European Patent Office | 2020
|